My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-95 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc. to Provide Final Design Engineering Services for the South Water Treatment Plant Electrical Improvements Project, City Project 2022-18
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-95 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc. to Provide Final Design Engineering Services for the South Water Treatment Plant Electrical Improvements Project, City Project 2022-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2023 10:35:50 AM
Creation date
5/17/2023 10:35:43 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-95
Res Ord Title
R2023-95 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc. to Provide Final Design Engineering Services for the South Water Treatment Plant Electrical Improvements Project, City Project 2022-18
Department
Public Works
Approved Date
5/15/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J"" <br /> 411LI <br /> CONCENTRIC <br /> I N T E G R AT I O N <br /> We sincerely look forward to sharing more ideas and working with you on this project. <br /> Scope of Services <br /> Labor <br /> Proiect Management <br /> 1. Plan, schedule, and coordinate the activities that must be performed to complete the Project. <br /> 2. Coordinate meetings and site investigations of Facility. <br /> 3. Provide project status updates via email every month. <br /> Design/Bidding Phase <br /> 4. DESIGN — Prepare Design Documents consisting of Drawings and Specifications showing the <br /> general scope, extent, and character of the construction work to be included in the Construction <br /> Plans and Specifications <br /> a. Tentative Sheet List <br /> i. Symbol Sheet <br /> ii. PID No.1 - Raw Water Pumping <br /> iii. PID No.2 - Raw Water PS MCC and Miscellaneous <br /> iv. PID No.3 - Chemical Feed MCC and Miscellaneous <br /> v. PID No.4 - HVAC MCC and Miscellaneous <br /> vi. PID No.5 - High Service & Transfer Pumping <br /> vii. PID No.6 -WP Main SWGR <br /> viii. PID No.7 - Nitrite Feed Pumping <br /> ix. PID No.8 - Nitrite Facility IX System (Typical) <br /> x. PID No.9 - Nitrite Facility Brine System <br /> xi. PID No.10 - Nitrite Facility Chem Pump <br /> xii. PID No.11 — Raw Water Dam Facility <br /> xiii. SCADA Network Diagram WTP <br /> xiv.SCADA Network Diagram WTP (SCC-2) <br /> xv. SCADA Network Diagram Nitrite (SCC-5) <br /> xvi.SCADA Network Diagram Raw Pumps (SCC-11) <br /> xvii. SCADA Network Diagram Dam (SCC-10) <br /> xviii. Installation Details <br /> Project#2325228.00 Page No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.