Laserfiche WebLink
J"" <br /> 411LI <br /> CONCENTRIC <br /> I N T E G R AT I O N <br /> We sincerely look forward to sharing more ideas and working with you on this project. <br /> Scope of Services <br /> Labor <br /> Proiect Management <br /> 1. Plan, schedule, and coordinate the activities that must be performed to complete the Project. <br /> 2. Coordinate meetings and site investigations of Facility. <br /> 3. Provide project status updates via email every month. <br /> Design/Bidding Phase <br /> 4. DESIGN — Prepare Design Documents consisting of Drawings and Specifications showing the <br /> general scope, extent, and character of the construction work to be included in the Construction <br /> Plans and Specifications <br /> a. Tentative Sheet List <br /> i. Symbol Sheet <br /> ii. PID No.1 - Raw Water Pumping <br /> iii. PID No.2 - Raw Water PS MCC and Miscellaneous <br /> iv. PID No.3 - Chemical Feed MCC and Miscellaneous <br /> v. PID No.4 - HVAC MCC and Miscellaneous <br /> vi. PID No.5 - High Service & Transfer Pumping <br /> vii. PID No.6 -WP Main SWGR <br /> viii. PID No.7 - Nitrite Feed Pumping <br /> ix. PID No.8 - Nitrite Facility IX System (Typical) <br /> x. PID No.9 - Nitrite Facility Brine System <br /> xi. PID No.10 - Nitrite Facility Chem Pump <br /> xii. PID No.11 — Raw Water Dam Facility <br /> xiii. SCADA Network Diagram WTP <br /> xiv.SCADA Network Diagram WTP (SCC-2) <br /> xv. SCADA Network Diagram Nitrite (SCC-5) <br /> xvi.SCADA Network Diagram Raw Pumps (SCC-11) <br /> xvii. SCADA Network Diagram Dam (SCC-10) <br /> xviii. Installation Details <br /> Project#2325228.00 Page No.2 <br />