Laserfiche WebLink
2. Approvals of Governmental Entities. Furnish to the City's Representative such documents and <br /> design data as may be required for, and assist in the preparation of,the required documents so <br /> that the City may apply for approvals of such governmental authorities as have jurisdiction over <br /> design criteria applicable to the Project,and assist in obtaining such approvals by participating in <br /> submissions to and negotiations with appropriate authorities. <br /> 3. Adjusted Project Costs. Advise the City's Representative of any adjustments to the latest opinion <br /> of probable Project Costs caused by changes in extent or design requirements of the Project or <br /> construction costs and furnish a revised opinion of probable Project Cost based on the Drawings <br /> and Specifications.Project Costs include construction cost,contingencies,allowances for charges <br /> of all professionals and consultants,allowances for the cost of land and rights-of-way, allowances <br /> for the relocation of utility facilities and equipment if necessary,and allowances for <br /> compensation for damages to properties and interest and financing charges. <br /> 4. Contract Document Preparation. Complete preparation of the construction contract documents by <br /> filling in the necessary information in Parts I, II,and IV of the City's standard CICO. The <br /> Consulting Engineer shall prepare Part 3 "Technical Specification"of the CICC for inclusion in <br /> the standard construction contract. The Consulting Engineer shall not alter the City's standard <br /> contract document without the permission of the City's Representative. The City's <br /> Representative may provide the Consulting Engineer with previously prepared Technical <br /> Specifications which may be used as appropriate. The Consulting Engineer shall,to the <br /> maximum extent possible,follow the formats for Technical Specifications as provided by the <br /> City's Representative. <br /> 5. Document Presentation. Furnish paper copies and digital copies of the CICC in the number and <br /> format specified in Exhibit A, Scope of Work and present and review the CICC in person with the <br /> City as the City's Representative shall direct. The cost of document reproduction shall be <br /> considered to be a reimbursable expense and paid in accordance with Section V(C)of this <br /> Agreement. <br /> 6. Completion Time. The Final Drawings and Specifications shall be completed, submitted and <br /> approved by the City's Representative within the time period set forth in Exhibit C,Project <br /> Timeline. <br /> C. BIDDING PHASE. <br /> The Consulting Engineer shall,after written authorization to proceed with the Bidding Phase: <br /> 1. Assist in Bidding. Assist the City's Representative in obtaining bids for each separate City <br /> contract for construction,materials,equipment and services for the Project. <br /> 2. Advise Regarding Contractors and Subcontractors. Consult with and advise the City's <br /> Representative as to the acceptability of subcontractors and other persons and organizations <br /> proposed by the City's Contractors, ("Contractors"), for those portions of the work as to which <br /> such acceptability is required by the bidding documents. <br /> 3. Consult Regarding Substitutes. Consult with and advise the City's Representative as to the <br /> acceptability of substitute materials and equipment proposed by the Contractors when substitution <br /> prior to the award of contracts is allowed by the bidding documents. <br /> 4. Distribute Plans and Contract Documents to Bidders. Reproduce sufficient copies of the plans <br /> and contract documents and make them available to all prospective bidders. The Consulting <br /> Engineer shall create a Plan Holder List by recording the business name,contact person name, <br /> address,telephone number,fax number and email address of each of the bidders taking a set of <br /> 3 <br /> Last Revised:2/03/2022 <br />