5/10/23,3:06 PM Item Coversheet <br /> $62.59 million Joint Funding Agreement for Construction Work between the State of Illinois and the City of Decatur. This <br /> agreement establishes the currently approved funding for the project and will allow bids to be received and construction to begin <br /> under the direction of the State of Illinois with day-to-day project management by the City with State and Federal reimbursement <br /> as outlined in the agreement and detailed on Table 1. <br /> Construction Engineering <br /> A significant component of the Agreement is the Local Public Agency Engineering Services Agreement with AECOM to manage <br /> the day-to-day construction oversight for the planned 3-year project. The construction engineering component is just under 8%of <br /> the expected construction cost,which is lower than the 10%-12%which would normally be anticipated on this type of a project. <br /> A detailed scope of services is provided in the agreement. The work includes: <br /> • Coordination with the City and affected businesses including the railroads. <br /> • Approval of Contractor prepared drawings and materials. <br /> • Construction observation and documentation in accordance with Federal and State requirements. <br /> • Preparation of"as-built"plans. <br /> Project Funding <br /> A complete outline of the current funding for the overall project is detailed on Table 1 in the Appendix. Of note,the project was <br /> pushed forward so quickly,the Joint Funding Agreement was put together and went through the IDOT approval process prior to <br /> the preparation of the final project estimate. The final project estimate was about$6.3 million higher than the estimate used for the <br /> Joint Agreement. Table 1 shows the overall funding based on the final construction project estimate of$63.7 million,which <br /> includes the two railroad agreements. <br /> Additional funds and proposed funding shown in Table 1 include: <br /> • Under the agreement with the Norfolk Southern Railway Company,the City will be reimbursed$1 million at the conclusion <br /> of this project. <br /> • On May 1,the City entered a Supplemental Petition with the Illinois Commerce Commission(ICC)to request an additional <br /> $5 million in Grade Crossing Protection Funds for the project. The ICC has indicated a willingness to provide requested <br /> additional funding. The plan is to have a Supplemental Order in place by the end of June. <br /> • City staff is preparing final documents with the Federal Railroad Administration(FRA)on an agreement for a$2 million <br /> Congressional Earmark provided by Senator Tammy Duckworth. This agreement should be finalized within the next two <br /> months. <br /> The City continues to work with our Transportation Consultant,Ann Schneider,to find additional funding sources to relieve the <br /> City's funding obligation. There is time to secure added funding as the State will normally pay for the project using Federal and <br /> State funds first and then seek the City funds toward the end of the project. <br /> PRIOR COUNCIL ACTION: <br /> See Appendix A for prior Council action on this item. <br /> POTENTIAL OBJECTIONS: There are no known objections. <br /> INPUT FROM OTHER SOURCES: <br /> AECOM,Illinois Department of Transportation <br /> SCHEDULE:DESIGN AND CONSTRUCTION: <br /> The project bid letting is planned for June 16,2023. Construction should begin within 2-3 months of the letting. The estimated <br /> time of construction is 36 months. <br /> STAFF REFERENCE: Matt Newell,Public Works Director or Paul Caswell,City Engineer.Paul Caswell will attend the City <br /> Council meeting to answer any questions of the Council on this item. <br /> https://decatur.novusagenda.com/agendaweb/CoverSheet.aspx?ItemID=4370 2/3 <br />