My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-159 Resolution Accepting the Proposal and Authorizing the Execution of an Agreement for Professional Services for the Electric Vehicle Readiness Plan with CDM Smith
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-159 Resolution Accepting the Proposal and Authorizing the Execution of an Agreement for Professional Services for the Electric Vehicle Readiness Plan with CDM Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 9:44:30 AM
Creation date
8/10/2023 9:44:27 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-159
Res Ord Title
R2023-159 Resolution Accepting the Proposal and Authorizing the Execution of an Agreement for Professional Services for the Electric Vehicle Readiness Plan with CDM Smith
Department
Mass Transit
Approved Date
8/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables Direct Costs <br /> • Deployment strategy PowerPoint slide deck, Travel expenses for City Council presentation <br /> including funding matrix (if made in-person) <br /> 7 Final Report. <br /> 7.1 Final Report.This task consists of production of the final report.The report <br /> document—up to 50 pages in length not including the executive summary or technical <br /> appendices—will include an executive summary.The executive summary will be <br /> professionally produced with high quality visuals and layout up to five (5 pages) in length. <br /> The final report will consist of the information presented through PowerPoint <br /> presentations summarizing Tasks 2-7.Analytical tools developed as part of the project will <br /> also be documented. It is assumed that the document will undergo two rounds of revision. <br /> The report will be developed and optimized for electronic distribution.While no printed <br /> copies are anticipated,an unlocked PDF will be provided so that printed materials may be <br /> generated from the electronic document if desired. <br /> Deliverables Direct • <br /> • Final Report,including Executive Summary(ES <br /> to be up to five pages) <br />
The URL can be used to link to this page
Your browser does not support the video tag.