Laserfiche WebLink
Deliverables Direct Costs <br /> • Deployment strategy PowerPoint slide deck, Travel expenses for City Council presentation <br /> including funding matrix (if made in-person) <br /> 7 Final Report. <br /> 7.1 Final Report.This task consists of production of the final report.The report <br /> document—up to 50 pages in length not including the executive summary or technical <br /> appendices—will include an executive summary.The executive summary will be <br /> professionally produced with high quality visuals and layout up to five (5 pages) in length. <br /> The final report will consist of the information presented through PowerPoint <br /> presentations summarizing Tasks 2-7.Analytical tools developed as part of the project will <br /> also be documented. It is assumed that the document will undergo two rounds of revision. <br /> The report will be developed and optimized for electronic distribution.While no printed <br /> copies are anticipated,an unlocked PDF will be provided so that printed materials may be <br /> generated from the electronic document if desired. <br /> Deliverables Direct • <br /> • Final Report,including Executive Summary(ES <br /> to be up to five pages) <br />