My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-219 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing & Heating Co., Inc. for the William Street Pump Station Improvements Project, City Project 2022-17
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-219 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing & Heating Co., Inc. for the William Street Pump Station Improvements Project, City Project 2022-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2023 12:25:39 PM
Creation date
10/18/2023 12:03:01 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-219
Res Ord Title
R2023-219 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing & Heating Co., Inc. for the William Street Pump Station Improvements Project, City Project 2022-17
Department
Public Works
Approved Date
10/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1. Surface preparation: Remove all existing <br /> asphaltic coating, loose annealing oxide, loose rust, <br /> and other loose detrimental foreign matter by power <br /> tool cleaning meeting NAPF 500-03-03 Power Tool <br /> ' Cleaning. Chemical paint stripper may be used if <br /> required to completely remove the asphaltic coating. <br /> 2. Prime Coat: A <br /> ' 3. Topcoat: A <br /> B. New ductile iron flanged adapter and restraining <br /> ' gland. <br /> 1. Surface preparation: Clean and abrade surface of <br /> factory applied epoxy coating as required by <br /> ' manufacturer of new coating. <br /> 2. Intermediate Coat: A <br /> 3. Topcoat: A <br /> ' Spec Section ADD the attached Asbestos Inspection Report after the end of <br /> 6 40 05 53 Valves Section 40 05 53. The report is reference in Par. 3.01.A. <br /> ' END OF ADDENDUM NUMBER 01 <br /> Decatur V TF/16011-01 2 of 2 Addendum No. 03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.