<br /> General Comments
<br /> Asbestos Survey
<br /> Accessible building areas were visually inspected for suspect asbestos containing materials within the scope of this inspection.
<br /> Materials suspected to contain asbestos are determined by EPA guidance materials, industry standards, and the inspector's
<br /> experience and training. Suspect asbestos containing materials are generally any materials which are not metal, concrete,
<br /> rubber,fiberglass, PVC, black foam glass,Armaflex, silicone or wood. However,the inspector ultimately determines what is
<br /> suspected to contain asbestos, and, based on their own discretion, may include any of these materials in certain situations.
<br /> A thorough inspection was completed, including,where applicable, checking above ceiling panels, behind walls, below carpet,
<br /> etc.,to attempt to locate hidden materials.This was conducted within reason,within time constraints, in line with inspector
<br /> safety and building occupancy constraints, and adhering to any desires of the client to avoid damage.Any suspect asbestos
<br /> containing materials not found in the survey must be assumed to be ACM until sampled.Additional suspect asbestos
<br /> containing materials may be found in pipe chases, hidden building cavities, behind walls, under floors, inside duct work, behind
<br /> existing finishes or other similar areas. Materials may be misidentified if covered by paint,wallpaper,carpet, etc.The inspection
<br /> ' did not include removal, dismantling or demolition of building components, unless otherwise noted. Unless specifically included
<br /> in this report, mechanical equipment, electrical systems, elevators and confined spaces are excluded from the inspection.A
<br /> return visit can always be requested for additional inspection service of opened wall cavities, discovered hidden spaces, HVAC
<br /> systems, etc.,to access previously excluded areas.
<br /> ' This survey was completed with generally accepted industry standard AHERA and/or NESHAP inspection practices within the
<br /> constraints of the client's directive and time frame. EPA-NESHAP asbestos inspections are completed for compliance
<br /> commonly associated with public and commercial buildings prior to renovation or demolition work.To help comply with the
<br /> ' OSHA asbestos general industry standard 29 CFR 1910.1001 and the OSHA asbestos construction standard 29 CFR
<br /> 1926.1101, the results of this report should be communicated to employees and other employers at the project site. For
<br /> residences,the inspection was completed using NESHAP rules as guidelines.
<br /> ' This inspection was prepared for the building owner or client as noted. If plans for the building change, additional inspection
<br /> service may be necessary. It was not prepared for others.Any reliance on or use of this report by any third party is done at the
<br /> risk of the third party. Reliance on this report by any third party does not make the third party a beneficiary to IDEAL's contract
<br /> with the building owner or client as noted.
<br /> ' The inspection was completed by EPA/AHERA-accredited, IDPH-licensed inspector(s)whose training is refreshed annually by
<br /> an EPA-approved training course provider. Though thorough,the inspection is limited, as training is not guaranteed to
<br /> encompass all clarifications, determinations, and amendments to regulations, nor is training guaranteed to cover all guidance
<br /> publications.
<br /> PLM is the standard analysis method specified in NESHAP and AHERA regulations for determining if a material is asbestos
<br /> containing, and unless otherwise noted, it was used as the standard analysis method for this inspection.
<br /> Unless otherwise noted,three(3)samples were collected per homogeneous building material, and this is the industry standard
<br /> to determine if a material is asbestos containing.AHERA requires additional samples of surfacing materials based on the
<br /> quantity of material. Based on established guidelines,the inspector determines how many samples are appropriate to achieve
<br /> ' sufficient sampling for the quantity of each material present.
<br /> Samples of friable materials are collected using random sampling. During random sampling, the Grid Method may not be used
<br /> to avoid destructive sampling in visible areas.
<br /> The inspector's determination of homogeneous areas and inferences for friability, damage condition,and whether a material is
<br /> regulated, category I or category II are guided by regulations but remain subjective and may differ from another inspector.
<br /> ' The inspection service excludes providing to any party suggested/required demolition contractor work practices, including but
<br /> not limited to NESHAP and OSHA regulations.
<br /> Sometimes, materials may appear to be homogeneous but may not be. While care has been taken to accurately determine
<br /> ' homogeneous materials, installation dates may differ unbeknownst to the inspector, different product brands may have been
<br /> used, or manufacturers may produce batches with different sources for raw materials. Determining homogeneity of drywall
<br /> systems (i.e. drywall,joint compound,tape) is especially difficult due to possible multiple installations, renovations, repairs and
<br /> since drywall systems are intentionally finished so these occurrences are not noticeable. In addition, replacement materials are
<br /> ' often purchased to match original materials.When replacement materials are near-identical to original materials or if their
<br /> presence is very localized or sporadic throughout,they may not be noted in this report.
<br /> Inspectors generally check for underlying flooring materials at corners, seams,thresholds or damaged areas, and not all
<br /> flooring is lifted. It is possible that multiple types of flooring are present under the accessible flooring if the top flooring is