Laserfiche WebLink
' Crawford,Murphy&Tilly <br /> William Street Pump Station,E.Main Street&S.29th Street, Decaur, IL <br /> October 6,2022/IDEAL Number 25115 <br /> General Comments <br /> Asbestos Survey <br /> Accessible building areas were visually inspected for suspect asbestos containing materials within the scope of this inspection. <br /> Materials suspected to contain asbestos are determined by EPA guidance materials, industry standards, and the inspector's <br /> experience and training. Suspect asbestos containing materials are generally any materials which are not metal, concrete, <br /> rubber,fiberglass, PVC, black foam glass,Armaflex, silicone or wood. However,the inspector ultimately determines what is <br /> suspected to contain asbestos, and, based on their own discretion, may include any of these materials in certain situations. <br /> A thorough inspection was completed, including,where applicable, checking above ceiling panels, behind walls, below carpet, <br /> etc.,to attempt to locate hidden materials.This was conducted within reason,within time constraints, in line with inspector <br /> safety and building occupancy constraints, and adhering to any desires of the client to avoid damage.Any suspect asbestos <br /> containing materials not found in the survey must be assumed to be ACM until sampled.Additional suspect asbestos <br /> containing materials may be found in pipe chases, hidden building cavities, behind walls, under floors, inside duct work, behind <br /> existing finishes or other similar areas. Materials may be misidentified if covered by paint,wallpaper,carpet, etc.The inspection <br /> ' did not include removal, dismantling or demolition of building components, unless otherwise noted. Unless specifically included <br /> in this report, mechanical equipment, electrical systems, elevators and confined spaces are excluded from the inspection.A <br /> return visit can always be requested for additional inspection service of opened wall cavities, discovered hidden spaces, HVAC <br /> systems, etc.,to access previously excluded areas. <br /> ' This survey was completed with generally accepted industry standard AHERA and/or NESHAP inspection practices within the <br /> constraints of the client's directive and time frame. EPA-NESHAP asbestos inspections are completed for compliance <br /> commonly associated with public and commercial buildings prior to renovation or demolition work.To help comply with the <br /> ' OSHA asbestos general industry standard 29 CFR 1910.1001 and the OSHA asbestos construction standard 29 CFR <br /> 1926.1101, the results of this report should be communicated to employees and other employers at the project site. For <br /> residences,the inspection was completed using NESHAP rules as guidelines. <br /> ' This inspection was prepared for the building owner or client as noted. If plans for the building change, additional inspection <br /> service may be necessary. It was not prepared for others.Any reliance on or use of this report by any third party is done at the <br /> risk of the third party. Reliance on this report by any third party does not make the third party a beneficiary to IDEAL's contract <br /> with the building owner or client as noted. <br /> ' The inspection was completed by EPA/AHERA-accredited, IDPH-licensed inspector(s)whose training is refreshed annually by <br /> an EPA-approved training course provider. Though thorough,the inspection is limited, as training is not guaranteed to <br /> encompass all clarifications, determinations, and amendments to regulations, nor is training guaranteed to cover all guidance <br /> publications. <br /> PLM is the standard analysis method specified in NESHAP and AHERA regulations for determining if a material is asbestos <br /> containing, and unless otherwise noted, it was used as the standard analysis method for this inspection. <br /> Unless otherwise noted,three(3)samples were collected per homogeneous building material, and this is the industry standard <br /> to determine if a material is asbestos containing.AHERA requires additional samples of surfacing materials based on the <br /> quantity of material. Based on established guidelines,the inspector determines how many samples are appropriate to achieve <br /> ' sufficient sampling for the quantity of each material present. <br /> Samples of friable materials are collected using random sampling. During random sampling, the Grid Method may not be used <br /> to avoid destructive sampling in visible areas. <br /> The inspector's determination of homogeneous areas and inferences for friability, damage condition,and whether a material is <br /> regulated, category I or category II are guided by regulations but remain subjective and may differ from another inspector. <br /> ' The inspection service excludes providing to any party suggested/required demolition contractor work practices, including but <br /> not limited to NESHAP and OSHA regulations. <br /> Sometimes, materials may appear to be homogeneous but may not be. While care has been taken to accurately determine <br /> ' homogeneous materials, installation dates may differ unbeknownst to the inspector, different product brands may have been <br /> used, or manufacturers may produce batches with different sources for raw materials. Determining homogeneity of drywall <br /> systems (i.e. drywall,joint compound,tape) is especially difficult due to possible multiple installations, renovations, repairs and <br /> since drywall systems are intentionally finished so these occurrences are not noticeable. In addition, replacement materials are <br /> ' often purchased to match original materials.When replacement materials are near-identical to original materials or if their <br /> presence is very localized or sporadic throughout,they may not be noted in this report. <br /> Inspectors generally check for underlying flooring materials at corners, seams,thresholds or damaged areas, and not all <br /> flooring is lifted. It is possible that multiple types of flooring are present under the accessible flooring if the top flooring is <br /> Ideal Environmental Engineering,Inc. (309)828-4259 www.idealenvironmental.com <br /> Page 115 <br />