My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-220 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc. to Provide Construction Support Services for the William Street Pump Station Improvement Project, City Project 2022-17
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-220 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc. to Provide Construction Support Services for the William Street Pump Station Improvement Project, City Project 2022-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2023 4:19:55 PM
Creation date
10/18/2023 12:29:07 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-220
Res Ord Title
R2023-220 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc. to Provide Construction Support Services for the William Street Pump Station Improvement Project, City Project 2022-17
Department
Public Works
Approved Date
10/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project upon Substantial Completion,to the results of any subsequent tests called for in the Contract <br /> Documents,and to any qualifications stated in his recommendation),and that payment of the amount <br /> recommended is due the Contractor(s). The Engineer's Payment Estimate shall be prepared not less <br /> than monthly while construction is proceeding. The pay estimate shall be prepared on a spreadsheet <br /> form supplied by the City's Representative at the beginning of this phase of work. <br /> G. Determination of Substantial Completion. The Consulting Engineer shall conduct an inspection to <br /> determine if the Project is substantially complete and conduct a final inspection to determine if the <br /> work has been completed in accordance with the Contract Documents and if each Contractor has <br /> fulfilled all of his obligations there under so that the Consulting Engineer may recommend,in writing, <br /> final payment to each Contractor and may give written notice to the City's Representative and the <br /> Contractor(s)that the work is acceptable(subject to any conditions therein expressed). <br /> H. Authority and Responsibility. The Consulting Engineer shall not guarantee the work of any <br /> Contractor or Subcontractor, shall have no authority to stop work, shall have no supervision or control <br /> as to the work or persons doing the work,shall not have charge of the work,shall not be responsible <br /> for safety in,on,or about the job-site or have any control of the safety or adequacy of any equipment, <br /> building component,scaffolding,supports,forms or other work aids,and shall have no duties or <br /> responsibilities imposed by the Structural Work Act upon the"owner"under that Act and shall not be <br /> the"person in control of work"within the meaning of that Act. <br /> I. Consulting Engineer Not Responsible for Acts of Contractor. The Consulting Engineer shall not be <br /> responsible for the supervision or control of the acts or omissions or construction means,methods or <br /> techniques of any Contractor,or Subcontractor,or any of the Contractor(s)'or Subcontractors'agents <br /> or employees or any other person(except the Consulting Engineer's own employees and agents)at the <br /> site or otherwise performing any of the Contractor(s)'work;however,nothing contained in this <br /> contract shall be construed to release the Consulting Engineer from liability for failure to properly <br /> perform duties undertaken by him in these Contract Documents or this Agreement. <br /> J. Preparation of Record Drawings. The Consulting Engineer shall prepare a set of record plans on <br /> which shall be noted all changes which may have occurred during construction. The record drawings <br /> need not detail changes in measurements,elevation lines or grades which are within the normally <br /> accepted construction tolerances. Record drawings may be prepared using AutoCAD or other <br /> electronic plan preparation method. Alternately,record drawings may be prepared using manual <br /> methods. The plans shall be delivered to the City's Representative in the form of one set of prints <br /> and electronic file if record drawings were prepared by electronic methods. The cost of document <br /> reproduction shall be considered to be a reimbursable expense and paid in accordance with Section <br /> V(C)of this agreement. <br /> K. Completion Time. The Consulting Engineer shall complete the Construction Support Phase within <br /> the time period set forth in Exhibit C,Project Timeline. <br /> SECTION III. CITY'S RESPONSIBILITIES <br /> The City shall, <br /> A. FURNISH REQUIREMENTS AND LIMITATIONS. Provide all criteria and full information as <br /> to the City's requirements for the Project,including design objectives and constraints,space,capacity <br /> and performance requirements,flexibility and expandability,economic parameters and any budgetary <br /> limitations; and furnish copies of all design and construction standards which the City will require to <br /> be included in the Drawings and Specifications. <br /> 3 <br /> Template Last Revised:2/03/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.