My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-249 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Christy-Foltz, Inc. for the Decatur Public Library Landscaping Wall Replacement Project, City Project 2023-26C
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-249 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Christy-Foltz, Inc. for the Decatur Public Library Landscaping Wall Replacement Project, City Project 2023-26C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2023 11:22:07 AM
Creation date
11/22/2023 11:22:06 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-249
Res Ord Title
R2023-249 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Christy-Foltz, Inc. for the Decatur Public Library Landscaping Wall Replacement Project, City Project 2023-26C
Department
City Manager
Approved Date
11/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/16/23, 11:54 AM Item Coversheet <br /> in <br /> Public Works <br /> DATE: 11/9/2023 <br /> MEMO: 2023-111 <br /> TO: Mayor Julie Moore Wolfe and City Council <br /> FROM: Scot Wrighton,City Manager <br /> Jon Kindseth,Deputy City Manager <br /> Matt Newell,P.E.,Public Works Director <br /> SUBJECT: Resolution Accepting the Bid and Authorizing the Execution of a Contract with Christy-Foltz,Inc.for the <br /> Municipal Services Corridor Addition Project,City Project 2023-07A <br /> SUMMARY RECOMMENDATION: <br /> It is recommended that Council adopt the attached resolutions authorizing the following building improvements at the Municipal <br /> Services Center and the Decatur Public Library: <br /> 1. Resolution awarding the contract for the Municipal Services Center Corridor Addition Project,City Project 2023-07A,to <br /> Christy-Foltz,Inc.,as the lowest,responsible bidder in the amount of$411,338. The resolution amount includes the bid price <br /> of$373,944 plus a 10%contingency of$37,394. The contract documents excluding project specific drawings,conditions,and <br /> provisions are attached. <br /> 2. Resolution awarding the contract for the Municipal Services Center Roof Rehabilitation Project,City Project 2023-0713,to <br /> Top Quality Roofing as the lowest,responsible bidder in the amount of$406,230.00 to install a PVC roof membrane. The <br /> resolution amount includes the bid price of$369,300 plus a 10%contingency of$36,930. The contract documents excluding <br /> project specific drawings,conditions,and provisions are attached. <br /> 3. Resolution awarding the contract for the Decatur Public Library Roof Replacement Project,City Project 2023-26A,to <br /> Advanced Commercial Roofing as the lowest,responsible bidder in the amount of$838,464.00 to install a PVC roof <br /> membrane. The resolution amount includes the bid price of$698,720 plus a 20%contingency of$139,744. The contract <br /> documents excluding project specific drawings,conditions,and provisions are attached. <br /> 4. Resolution awarding the contract for the Decatur Public Library Landscaping Wall Replacement Project,City Project 2023- <br /> 26C,to Christy-Foltz,Inc.,as the lowest,responsible bidder in the amount of$239,890. The resolution amount includes the <br /> base bid price of$160.325 and Alternate 1 for$57,757 plus a 10%contingency of$21,808. The contract documents excluding <br /> project specific drawings,conditions,and provisions are attached. <br /> BACKGROUND: <br /> Municipal Services Center Addition and Roof Improvements—The MSC was constructed in 1987. A facility study was <br /> completed by AEX in 2017. Two of the major items addressed in the study were the condition of the roof and improving the <br /> internal circulation. <br /> The roof is original to the structure and was coated with a water proofing material in 2002. The roof is now in need of major <br /> improvements. AEX proposed two options for roof improvements: Thermoplastic Polyoefin(TPO)membrane or a PVC <br /> membrane. The recommended option is to go with the PVC membrane. <br /> The MSC has two main entryways,one for the Municipal Services Division and the other for the Water Services Division. Staff <br /> members must go through the men's and women's restrooms to move between the main office areas. The 2017 AEX facility study <br /> recommended that this internal circulation be improved by providing a corridor along the west wall of the building. <br /> Decatur Public Library Improvements—The City needs to upgrade the HVAC system for the library. To prepare for this work it <br /> is necessary to replace the roof. AEX prepared designs for two options similar to those provided for the MSC,namely,at TPO <br /> membrane or PVC membrane options. The PVC membrane is the recommended option for the library roof. <br /> hftps://decatur.novusagenda.com/agendaweb/CoverSheet.aspx?Item I D=4652 1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.