Bidder RFI's and Responses <br /> 1. Does the City of Decatur Public Works have a list of approved DBE subcontractors for <br /> work on Decatur projects? Can approved IDOT or CMS DBE subcontractors be utilized? <br /> The City does not have a list or an approval process to be a subcontractor for City <br /> projects. We have always found that contractors keep the most up to date lists as an <br /> ongoing relationship with the subcontractor(s) is the best way to get actual bids. The <br /> subcontractor(s) selected will self-certify they are a Minority Business Enterprise (MBE) <br /> when they fill out the Minority Business Enterprise (MBE) Information Form on Page 24 <br /> of the documents. Sources like IDOT are good sources to reference, however you must <br /> verify that they are an MBE. IDOT and other sources may identify Disadvantage Owned <br /> Business (DBE), with include more than MBE. <br /> 2. Section 02324.1.5.13 states that an excavationp <br /> rotection Ian signed by a structural <br /> p <br />' engineer or a geotechnical PE is required to be submitted. The depth of sewer for this <br /> project is from 7.67 to 13.24 feet for which standard movable shoring trench boxes will <br /> be utilized. OSHA requires a sealed protection plan only for trenches in excess of 20 ft <br /> ' deep. Is a protection plan required for this project? <br /> Use of sheeting, shoring and bracing are only as required. This will be clarified in <br /> contract documents. <br /> 3. Specifications state that backfill for sewers under grass areas can be type S2 (earth <br /> materials) The quantity of trench backfill in the bid schedule appears to be for granular <br /> trench backfill for the entire run of sewer from MH3 to MH7. Is it the intent to use <br /> granular backfill for the entire trench line. Please confirm. <br /> rGranular backfill limits will be clarified in Addendum #2 to be limited to piping from <br /> approximately station 6+50 to 9+25. <br /> ' 4. Section 02315/3.5 CONSTRUCTION SHEETING SHORING AND BRACING states in part in <br /> paragraph A—"The Contractor shall install temporary protective work, which shall be <br /> left in place, unless otherwise required to be removed or unless otherwise directed by the <br /> Engineer, including, but not limited to, sheeting, tie-back sheeting, shoring, <br /> underpinning, timbering, bracing, or steel sheet piling as required so that the work can <br /> be installed in a safe and efficient manner and to protect existing structures, utilities, <br /> roadways and berms. When the work is complete, sheeting, shoring, and bracing shall be <br /> removed to 4 feet below finished grade, unless otherwise noted. Fill vacancies left by the <br /> rsheeting, with sand,and compact. Safety systems shall meet the requirements of OSHA <br /> and governing codes."Is a protective work structure required to be left in place? For the <br /> ' relatively shallow sewers on this job (7.67ft. to 13.24ft.) in an open field area, a movable <br /> trench box meeting OSHA requirements would generally be utilized. <br />