Laserfiche WebLink
on the street side of the curb stop as well as the customer service line on the private side of <br /> the curb stop. <br /> Disturbance of the existing water service line should be minimized. Cleaning of the <br /> water service lines is not required. <br /> The locations at which Exploratory Excavations shall be performed are as listed in the <br /> Appendix. The Contractor may request the Engineer to approve a change of the daylighting <br /> ' to an adjacent location if a particular curb stop is within a paved surface or otherwise difficult <br /> to access. <br /> ' Exploratory Excavation shall be performed according to Section 22 of the Standard <br /> Specifications for Water and Sewer Construction in Illinois, latest edition. Contractor may <br /> select the means and methods for Exploratory Excavation; however, the City prefers methods <br /> ' that involve the least possible surface disturbance or disturbance to the water service line. <br /> ' The Contractor shall perform tests to investigate the actual material of the water <br /> service line. One acceptable method is to perform a magnet test with a neodymium magnet of <br /> at least 500 lb pull strength. Water service lines that have a magnetic pull shall be counted as <br /> galvanized. Water service lines that do not have a magnetic pull shall be counted as non- <br /> galvanized. The Contractor may propose alternate methods. <br /> 1 The Contractor shall take three photographs of the site: 1) the exposed water service <br /> line on the PWS side, 2) the exposed water service line on the customer side, and 3) a photo <br /> of the site with the excavated hole in the foreground and the building served by the water <br /> service line in the background. For the first two photographs, the use of an endoscopic sewer <br /> camera connected to a mobile device is encouraged but not required. <br /> ' The Contractor shall provide the inspection results on ArcGIS Field Maps, a web- <br /> based app suitable for mobile devices. The app is available for download at no cost. The City <br /> will publish a field map for Contractor use which will be pre-loaded with the water service <br /> line points and a data entry form. The Contractor will need to click on the point,then click on <br /> whether the PWS and customer water service lines tested as galvanized or non-galvanized at <br /> that location. The Contractor will also upload the three photos to the point. The point will <br /> change color once all of the data is uploaded. <br /> The Exploratory Excavation pothole shall be backfilled with earth and/or sand and <br /> ' compacted with hand tamping to original grade. Surface restoration is not anticipated. <br /> Spoils from the Exploratory Excavation may be disposed of at a stockpile behind the <br /> ' City's Municipal Services Center, 2600 N. Jasper Street, Decatur, IL. <br /> The exploratory excavation hole at each curb stop shall be counted as one EACH <br /> EXPLORATORY EXCAVATION. <br />