My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-27 Resolution Accepting the Bid and Authorizing the Execution of a Contract with C-Hill Civil Contractors, Inc and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-27 Resolution Accepting the Bid and Authorizing the Execution of a Contract with C-Hill Civil Contractors, Inc and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:52:54 AM
Creation date
2/8/2024 3:42:35 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-27
Res Ord Title
R2024-27 Resolution Accepting the Bid and Authorizing the Execution of a Contract with C-Hill Civil Contractors, Inc and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur
Department
Public Works
Approved Date
2/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> LR 109-3 <br /> Page 1 of 4 <br /> 1State of Illinois <br /> DEPARTMENT OF TRANSPORTATION <br /> Bureau of Local Roads and Streets <br /> ' SPECIAL PROVISION <br /> FOR <br /> FUEL COST ADJUSTMENT FOR LOCAL LETTINGS <br /> ' (RETURN FORM WITH BID) <br /> Effective: June 16,2017 <br /> Revised: <br /> ' Description. Fuel cost adjustments will be made to provide additional compensation to the <br /> Contractor, or a credit to the project owner, for fluctuations in fuel prices when optioned by the <br /> Contractor. The bidder shall indicate on the attached form whether or not this special provision <br /> ' will be part of the contract and submit the completed form with his/her bid. Failure to submit the <br /> form or failure to indicate contract number, company name and sign and date the form shall make <br /> this contract exempt of fuel cost adjustments for all categories of work. Failure to indicate "Yes" <br /> for any category of work will make that category of work exempt from fuel cost adjustment, <br /> General. The fuel cost adjustment shall apply to contract pay items as grouped by category. The <br /> adjustment shall only apply to those categories of work checked "Yes", and only when the <br /> ' cumulative plan quantities for a category exceed the required threshold. Adjustments to work <br /> items in a category, either up or down, and extra work paid for by agreed unit price will be subject <br /> to fuel cost adjustment only when the category representing the added work was subject to the <br /> fuel cost adjustment. Extra work paid for at a lump sum price or by force account will not be <br /> subject to fuel cost adjustment. Category descriptions and thresholds for application and the fuel <br /> usage factors which are applicable to each are as follows: <br /> ' (a) Categories of Work. <br /> (1) Category A: Earthwork. Contract pay items performed under Sections 202, 204, and <br /> 206 of the IDOT Standard Specifications for Road and Bridge Construction including <br /> any modified standard or nonstandard items where the character of the work to be <br /> performed is considered earthwork. The cumulative total of all applicable item plan <br /> quantities shall exceed 25,000 cu yd (20,000 cu m). Included in the fuel usage factor <br /> is a weighted average 0.10 gal/cu yd (0.50 liters/cu m) factor for trucking. <br /> (2) Category B: Subbases and Aggregate Base Courses. Contract pay items constructed <br /> ' under Sections 311, 312 and 351 of the IDOT Standard Specifications for Road and <br /> Bridge Construction including any modified standard or nonstandard items where the <br /> character of the work to be performed is considered construction of a subbase or <br /> ' aggregate, stabilized or modified base course. The cumulative total of all applicable <br /> item plan quantities shall exceed 5000 tons (4500 metric tons). Included in the fuel <br /> usage factor is a 0.60 gal/ton (2.50 liters/metric ton) factor for trucking. <br />
The URL can be used to link to this page
Your browser does not support the video tag.