My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-27 Resolution Accepting the Bid and Authorizing the Execution of a Contract with C-Hill Civil Contractors, Inc and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-27 Resolution Accepting the Bid and Authorizing the Execution of a Contract with C-Hill Civil Contractors, Inc and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:52:54 AM
Creation date
2/8/2024 3:42:35 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-27
Res Ord Title
R2024-27 Resolution Accepting the Bid and Authorizing the Execution of a Contract with C-Hill Civil Contractors, Inc and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur
Department
Public Works
Approved Date
2/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' LR 109-3 <br /> Page 2 of 4 <br /> (3) Category C: Hot-Mix Asphalt (HMA) Bases, Pavements and Shoulders. Contract pay <br /> items constructed under Sections 355, 406, 407 and 482 of the IDOT Standard <br /> Specifications for Road and Bridge Construction including any modified standard or <br /> nonstandard items where the character of the work to be performed is considered HMA <br /> bases, pavements and shoulders. The cumulative total of all applicable item plan <br /> quantities shall exceed 5000 tons (4500 metric tons). Included in the fuel usage factor <br /> is 0.60 gal/ton (2.50 liters/metric ton) factor for trucking. <br /> (4) Category D: Portland Cement Concrete (PCC) Bases, Pavements and Shoulders. <br /> Contract pay items constructed under Sections 353, 420, 421 and 483 of the IDOT <br /> Standard Specifications for Road and Bridge Construction including any modified <br /> standard or nonstandard items where the character of the work to be performed is <br /> considered PCC base, pavement or shoulder. The cumulative total of all applicable <br /> ' item plan quantities shall exceed 7500 sq yd (6000 sq m). Included in the fuel usage <br /> factor is 1.20 gal/cu yd (5.94 liters/cu m) factor for trucking. <br /> (5) Category E: Structures. Structure items having a cumulative bid price that exceeds <br /> $250,000 for pay items constructed under Sections 502, 503, 504, 505, 512, 516 and <br /> 540 of the IDOT Standard Specifications for Road and Bridge Construction including <br /> any modified standard or nonstandard items where the character of the work to be <br /> ' performed is considered structure work when similar to that performed under these <br /> sections and not included in categories A through D. <br /> ' (b) Fuel Usage Factors. <br /> English Units <br /> Category Factor Units <br /> A- Earthwork 0.34 gal/cu yd <br /> B— Subbase and Aggregate Base courses 0.62 gal/ton <br /> C— HMA Bases, Pavements and Shoulders 1.05 gal/ton <br /> D— PCC Bases, Pavements and Shoulders 2.53 gal/cu yd <br /> E—Structures 8.00 gal/ $1000 <br /> Metric Units <br /> Category Factor Units <br /> A- Earthwork 1.68 liters/cu m <br /> B—Subbase and Aggregate Base courses 2.58 liters/ metric ton <br /> C— HMA Bases, Pavements and Shoulders 4.37 liters/ metric ton <br /> D— PCC Bases, Pavements and Shoulders 12.52 liters/cu m <br /> E—Structures 30.28 liters/ $1000 <br /> (c) Quantity Conversion Factors. <br /> Category Conversion Factor <br /> B sq yd to ton 0.057 ton /sq yd / in depth <br /> sq m to metric ton 0.00243 metric ton /sq m / mm depth <br /> ' C sq yd to ton 0.056 ton / sq yd / in depth <br /> sq m to metric ton 0.00239 m ton /sq m / mm depth <br /> D sq yd to cu yd 0.028 cu yd /sq yd / in depth <br /> sq m to cu m 0.001 cu m/sq m /mm depth <br />
The URL can be used to link to this page
Your browser does not support the video tag.