R2024-27 Resolution Accepting the Bid and Authorizing the Execution of a Contract with C-Hill Civil Contractors, Inc and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-27 Resolution Accepting the Bid and Authorizing the Execution of a Contract with C-Hill Civil Contractors, Inc and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:52:54 AM
Creation date
2/8/2024 3:42:35 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-27
Res Ord Title
R2024-27 Resolution Accepting the Bid and Authorizing the Execution of a Contract with C-Hill Civil Contractors, Inc and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur
Department
Public Works
Approved Date
2/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> ' LR 109-4 <br /> Page 2 of 4 <br /> ' Method of Adjustment. Steel cost adjustments will be computed as follows: <br /> SCA = QXD <br /> Where: SCA = steel cost adjustment, in dollars <br /> Q = quantity of steel incorporated into the work, in Ib (kg) <br /> ' D = price factor, in dollars per lb (kg) <br /> - <br /> D MPIM- MPIL <br /> ' Where: MPIM = The Materials Cost Index for steel as published by the Engineering News- <br /> Record for the month the steel is shipped from the mill. The indices will be <br /> converted from dollars per 100 Ib to dollars per Ib (kg). <br /> MPIL = The Materials Cost Index for steel as published by the Engineering News- <br /> Record for the month prior to the letting for work paid for at the contract price; <br /> or for the month the agreed unit price letter is submitted by the Contractor for <br /> ' extra work paid for by agreed unit price. The indices will be converted from <br /> dollars per 100 Ib to dollars per Ib (kg). <br /> The unit weights (masses) of steel that will be used to calculate the steel cost adjustment for the <br /> various items are shown in the attached table. <br /> No steel cost adjustment will be made for any products manufactured from steel having a mill <br /> shipping date prior to the letting date. <br /> If the Contractor fails to provide the required documentation, the method of adjustment will be <br /> ' calculated as described above; however, the MPIM will be based on the date the steel arrives at <br /> the job site. In this case, an adjustment will only be made when there is a decrease in steel costs. <br /> ' Basis of Payment. Steel cost adjustments may be positive or negative but will only be made when <br /> there is a difference between the MPIL and MPIM in excess of five percent, as calculated by: <br /> Percent Difference = {(MPIL- MPIM) - MPIL} x 100 <br /> rSteel cost adjustments will be calculated by the Engineer and will be paid or deducted when all <br /> other contract requirements for the items of work are satisfied. Adjustments will only be made for <br /> fluctuations in the cost of the steel as described herein. No adjustment will be made for changes <br /> in the cost of manufacturing, fabrication, shipping, storage, etc. <br /> ' The adjustments shall not apply during contract time subject to liquidated damages for completion <br /> of the entire contract. <br /> 1 <br /> r <br /> r <br /> i <br />