My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-28 Resolution Authorizing a Construction Engineering Services Agreement with WHKS and Co. and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge Over Sand Creek Arm of Lake Decatur
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-28 Resolution Authorizing a Construction Engineering Services Agreement with WHKS and Co. and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge Over Sand Creek Arm of Lake Decatur
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 3:52:46 PM
Creation date
2/8/2024 3:52:44 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-28
Res Ord Title
R2024-28 Resolution Authorizing a Construction Engineering Services Agreement with WHKS and Co. and Appropriating Motor Fuel Tax Rebuild Illinois (RBI) Funds for the Grove Road Bridge Over Sand Creek Arm of Lake Decatur
Department
Public Works
Approved Date
2/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
determined in this AGREEMENT less the total of the amount of partial payments previously paid to the ENGINEER <br /> shall be due and payable to the ENGINEER. <br /> (c)For Non-Federal County Projects-(605 ILCS 5/5409) <br /> (1)For progressive payments-Upon receipt of monthly invoices from the ENGINEER and the approval thereof by the <br /> LPA, monthly payments for the work performed shall be due and payable to the ENGINEER. Such payments to be <br /> equal to the value of the partially completed work in all previous partial payments made to the ENGINEER. <br /> (2) Final payment-Upon approval of the work by the LPA but not later than 60 days after the work is completed and <br /> reports have been made and accepted by the LPA and STATE, a sum of money equal to the basic fee as <br /> determined in the AGREEMENT less the total of the amount of partial payments previously paid to the ENGINEER <br /> shall be due and payable to the ENGINEER. <br /> 5. To pay the ENGINEER as compensation for all services rendered in accordance with the AGREEMENT on the basis of the <br /> following compensation method as discussed in 5-5.10 of the BLR Manual. <br /> Method of Compensation: <br /> ❑ Percent <br /> ❑ Lump Sum <br /> ® Specific Rate $19,230.00 (Maximum Fee$150,000) <br /> ❑ Cost plus Fixed Fee: <br /> Total Compensation =DL+ DC+OH+ FF <br /> Where: <br /> DL is the total Direct Labor, <br /> DC is the total Direct Cost, <br /> OH is the firm's overhead rate applied to their DL and <br /> FF is the Fixed Fee. <br /> Where FF=(0.33+R)DL+ %SubDL,where R is the advertised Complexity Factor and %SubDL is 10%profit <br /> allowed on the direct labor of the subconsultants. <br /> The Fixed Fee cannot exceed 15%of the DL+OH. <br /> Field Office Overhead Rates: Field rates must be used for construction engineering projects expected to exceed one <br /> year in duration or if the construction engineering contract exceeds$1,000,000 for any project duration. <br /> 6. The recipient shall not discriminate on the basis of race,color, national original or sex in the award and performance of any US <br /> DOT-assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26.The recipient shall take <br /> all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of US <br /> DOT-assisted contracts. The recipient's DBE program,as required by 49 CFR part 26 and as approved by US DOT, is <br /> incorporated by reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms <br /> shall be treated as violation of this AGREEMENT. Upon notification to the recipient of its failure to carry out its approved program, <br /> the Department may impose sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for <br /> enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986(31 U.S.0 3801 et seq.). <br /> III. IT IS MUTUALLY AGREED, <br /> 1. To maintain,for a minimum of 3 years after the completion of the contract,adequate books, records and supporting documents to <br /> verify the amount, recipients and uses of all disbursements of funds passing in conjunction with the contract;the contract and all <br /> books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General, <br /> and the DEPARTMENT; the Federal Highways Administration (FHWA)or any authorized representative of the federal <br /> government, and to provide full access to all relevant materials. Failure to maintain the books, records and supporting documents <br /> required by this section shall establish a presumption in favor of the DEPARTMENT for the recovery of any funds paid by the <br /> DEPARTMENT under the contract for which adequate books, records and supporting documentation are not available to support <br /> their purported disbursement. <br /> 2. That the ENGINEER shall be responsible for any and all damages to property or persons arising out of an error,omission and/or <br /> negligent act in the prosecution of the ENGINEER's work and shall indemnify and save harmless the LPA,the DEPARTMENT, <br /> and their officers,agents and employees from all suits, claims, actions or damages liabilities, costs or damages of any nature <br /> whatsoever resulting there from.These indemnities shall not be limited by the listing of any insurance policy. <br /> The LPA will notify the ENGINEER of any error or omission believed by the LPA to be caused by the negligence of the <br /> ENGINEER as soon as practicable after the discovery.The LPA reserves the right to take immediate action to remedy any error <br /> or omission if notification is not successful; if the ENGINEER fails to reply to a notification;or if the conditions created by the error <br /> or omission are in need of urgent correction to avoid accumulation of additional construction costs or damages to property and <br /> reasonable notice is not practicable. <br /> 3. This AGREEMENT may be terminated by the LPA upon giving notice in writing to the ENGINEER at the ENGINEER's last known <br /> post office address. Upon such termination,the ENGINEER shall cause to be delivered to the LPA all drawings, plats,surveys, <br /> reports, permits,agreements,soils and foundation analysis, provisions, specifications, partial and completed estimates and data <br /> Completed 01/30/24 Page 3 of 9 BLR 05530(Rev.07/08/22) <br />
The URL can be used to link to this page
Your browser does not support the video tag.