Laserfiche WebLink
AGREEMENT EXHIBITS <br /> The following EXHIBITS are attached hereto and made a part of hereof this AGREEMENT: <br /> ® EXHIBIT A:Scope of Services <br /> ® EXHIBIT B: Project Schedule <br /> ® EXHIBIT C:Qualification Based Selection(QBS)Checklist <br /> ❑ EXHIBIT D: Cost Estimate of Consultant(CECS)Services Worksheet(BLR 05513 or BLR 05514 ) <br /> ® EXHIBIT D : Direct Costs Check Sheet(attach BDE 436 when using Lump Sum on Specific Rate Compensation) <br /> ® Exhibit E:Engineering Estimate Specific Rate <br /> I. THE ENGINEER AGREES, <br /> 1. To perform or be responsible for the performance of the Scope of Services presented in EXHIBIT A for the LPA in connection <br /> with the proposed improvements herein before described. <br /> 2. The Classifications of the employees used in the work shall be consistent with the employee classifications and estimated staff <br /> hours. If higher-salaried personnel of the firm, including the Principal Engineer, perform services that are to be performed by <br /> lesser-salaried personnel,the wage rate billed for such services shall be commensurate with the payroll rate for the work <br /> performed. <br /> 3. That the ENGINEER shall be responsible for the accuracy of the work and shall promptly make necessary revisions or <br /> corrections required as a result of the ENGINEER'S error, omissions or negligent acts without additional compensation. <br /> Acceptance of work by the LPA or DEPARTMENT will not relieve the ENGINEER of the responsibility to make subsequent <br /> correction of any such errors or omissions or the responsibility for clarifying ambiguities. <br /> 4. That the ENGINEER will comply with applicable Federal laws and regulations, State of Illinois Statutes, and the local laws or <br /> ordinances of the LPA. <br /> 5. To pay its subconsultants for satisfactory performance no later than 30 days from receipt of each payment from the LPA. <br /> 6. To invoice the LPA,The ENGINEER shall submit all invoices, based on the ENGINEER's progress reports,to the LPA employee <br /> In Responsible Charge, no more than once a month for partial payment on account for the ENGINEER's work to date. Such <br /> invoices shall represent the value,to the LPA of the partially completed work, based on the sum of the actual costs incurred, plus <br /> a percentage(equal to the percentage of the construction engineering completed)of the fixed fee for the fully completed work. <br /> 7. The ENGINEER or subconsultant shall not discriminate on the basis of race,color, national origin or sex in the performance of <br /> this AGREEMENT.The ENGINEER shall carry out applicable requirements of 49 CFR part 26 in the administration of US <br /> Department of Transportation(US DOT)assisted contract. Failure by the Engineer to carry out these requirements is a material <br /> breach of this AGREEMENT,which may result in the termination of this AGREEMENT or such other remedy as the LPA deems <br /> appropriate. <br /> 8. That none of the services to be furnished by the ENGINEER shall be sublet, assigned or transferred to any other party or parties <br /> without written consent of the LPA.The consent to sublet,assign or otherwise transfer any portion of the services to be furnished <br /> by the ENGINEER shall be construed to relieve the ENGINEER of any responsibility for the fulfillment of this AGREEMENT. <br /> 9. For Construction Engineering Contracts: <br /> (a)For Quality Assurance services, provide personnel who have completed the appropriate STATE Bureau of Materials <br /> QC/QA trained technical classes. <br /> (b) For all projects where testing is required,the ENGINEER shall obtain samples according to the STATE Bureau of <br /> Materials"Manual of Test Procedures for Materials,"submit STATE Bureau of Materials inspection reports;and <br /> verify compliance with contract specifications. <br /> 10. That engineering services shall include all equipment, instruments, supplies,transportation and personnel required to perform the <br /> duties of the ENGINEER in connection with this AGREEMENT(See DIRECT COST tab in BLR 05513 or BLR 05514). <br /> 11. THE LPA AGREES, <br /> 1. To certify by execution of this AGREEMENT that the selection of the ENGINEER was performed in accordance with the <br /> Professional Services Selection Act(50 ILCS 510)(Exhibit C). <br /> 2. To furnish the ENGINEER all presently available survey data, plans, specifications,and project information. <br /> 3. For Construction Engineering Contracts: <br /> (a)To furnish a full time LPA employee to be In Responsible Charge authorized to administer inherently governmental <br /> PROJECT activities. <br /> (b)To submit approved forms BC 775 and BC 776 to the DEPARTMENT when federal funds are utilized. <br /> 4. To pay the ENGINEER: <br /> (a)For progressive payments-Upon receipt of monthly invoices from the ENGINEER and the approval thereof by the <br /> LPA, monthly payments for the work performed shall be due and payable to the ENGINEER,such payments to be <br /> equal to the value of the partially completed work minus all previous partial payments made to the ENGINEER. <br /> (b) Final payment-Upon approval of the work by the LPA but not later than 60 days after the work is completed and <br /> reports have been made and accepted by the LPA and DEPARTMENT a sum of money equal to the basic fee as <br /> Completed 01/30/24 Page 2 of 9 BLR 05530(Rev.07/08/22) <br />