Laserfiche WebLink
Mound Road <br /> Over Stevens Creek <br /> Section 19-00935-00-BR <br /> SN 058-3062 <br /> City of Decatur <br /> STATE OF ILLINOIS <br /> SPECIAL PROVISIONS <br /> ' The following Special Provisions supplement the "Standard Specifications for Road and Bridge <br /> Construction", adopted January 1, 2022, the latest edition of the "Illinois Manual on Uniform <br /> ' Traffic Control Devices for Streets and Highways", and the "Manual of Test Procedures for <br /> Materials" in effect on the date of invitation for bids, the Supplemental and Recurring Special <br /> Provisions adopted January 1, 2024 (as indicated on the check sheet included herein) which <br /> apply to and govern the construction of Section 19-00935-00-BR in Macon County, and in case <br /> of conflict with any part, or parts, of said Specifications, the said Special Provisions shall take <br /> precedence and shall govern. <br /> DESCRIPTION OF WORK <br /> The proposed improvement designated as Section 19-00935-00-BR, beginning at Sta. <br /> 14+31.25 (Back of West Abutment), along the existing centerline of West Mound Road (FAU <br /> 7359) and extending in an easterly direction to Sta. 15+68.75 (Back of East Abutment), includes <br /> substructure repairs to the existing concrete abutments, slopewalls, and piers to be <br /> accomplished utilizing temporary shoring and cribbing of existing deck beams with no in-stream <br /> work or work to be done from above the roadway level. The work shall be performed during a <br /> low water period to access as many of the repair areas as possible. <br /> tTRAFFIC CONTROL PLAN <br /> Traffic Control (for off road operations) shall be in accordance with the applicable sections of the <br /> "Standard Specifications for Road and Bridge Construction", the applicable guidelines contained <br /> in the "Illinois Manual on Uniform Traffic Control Devices for Streets and Highways", these <br /> Special Provisions and any special details and Highway Standards contained herein and in the <br /> ' plans. Layout and maintenance of the traffic control devices shall be the responsibility of the <br /> Contractor. The appropriate traffic control devices shall be utilized for the various construction <br /> activities being performed by the Contractor. <br /> Special attention is called to Section 701 and Articles 107.09 and 107.14 of the "Standard <br /> Specifications for Road and Bridge Construction" and the following Highway Standards relating <br /> to traffic control: <br /> Highway Standards <br /> 701001 701006 701901 <br /> ' Traffic control and protection for off road operations, provided in accordance with all Standards, <br /> will not be paid for separately but shall be paid for at the contract LUMP SUM price for <br /> MOBILIZATION, which price shall include all labor, equipment and materials necessary to <br /> complete the work. <br /> TEMPORARY SHORING AND CRIBBING <br /> ' Description: This item shall consist of furnishing all material, equipment and labor to support the <br /> affected beam(s) during the substructure repairs as shown on the plans, as herein specified and <br /> ' as directed by the Engineer. <br /> ' 1 <br />