My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-29 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-29 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:52:20 AM
Creation date
2/8/2024 3:56:54 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-09
Res Ord Title
R2024-09 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
Department
Public Works
Approved Date
2/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mound Road <br /> Over Stevens Creek <br /> Section 19-00935-00-BR <br /> SN 058-3062 ' <br /> City of Decatur <br /> Construction Requirements: The Contractor shall submit details and calculations, prepared and <br /> sealed by an Illinois Licensed Structural Engineer, of the support system he/she proposes to <br /> use for approval of the Engineer prior to ordering of material and implementation. Such approval <br /> shall in no way relieve the Contractor of responsibility for the safety of the structure. The ' <br /> supports used shall be such that vertical adjustments may be made in order to maintain the <br /> existing beam profile. Prior to starting substructure repairs, the temporary supports shall be <br /> used to place an upward reaction on the affected beams designated in the plans, equal to but ' <br /> not larger than the dead load reactions given in the plans, thus relieving the superstructure dead <br /> load reaction from the substructure unit to be repaired. It is not the intention to raise the affected <br /> beams. As the vertical load is incrementally increased to the specified load, if vertical movement <br /> is detected the load shall not be increased further. <br /> Additionally, if the work is to be completed under stage construction without traffic directly over <br /> the beams being shored then the Temporary Shoring and Cribbing shall be designed to carry ' <br /> the Dead Load plus 1/2 (Live Load + Imp) as shown in the plans. If work is to be completed with <br /> traffic directly over the beams being shored then the Temporary Shoring and Cribbing shall be <br /> designed to carry the Dead Load plus full (Live Load + Imp) as shown in the plans. , <br /> Basis of Payment: The work specified herein, as shown on the plans and as directed by the <br /> Engineer, shall be paid for at the contract unit price EACH for TEMPORARY SHORING AND <br /> CRIBBING for each beam support location required. <br /> SLOPE WALL CRACK SEALING ' <br /> Description: This work shall consist of sealing cracks in slope wall with a non-sag elastomeric <br /> polyurethane sealant. <br /> Materials: Materials shall be according to the following: ' <br /> (a) Non-sag Elastomeric Polyurethane Sealant meeting the requirements of ASTM C-920, Type <br /> S, Grade NS, Class 35, Use T. ' <br /> CONSTRUCTION REQUIREMENTS <br /> General: The sealing material shall be applied to the cracks or portions thereof that are ' <br /> detailed in the plans or as directed by the Engineer at the time of construction. <br /> The areas for slope wall crack sealing shall be prepared by removing all dust, debris, or <br /> disintegrated material from the crack by the use of oil-free compressed air. Any cracks holding <br /> oil or grease shall be chipped out to clean concrete. For cracks deeper or wider than 1/4 inch, a <br /> Backer Rod should be placed in the crack before applying the sealant. The backer rod <br /> diameters shall be 1/8 inch wider than the crack width. The backer rod shall be a closed-cell, , <br /> plastic-foam, chemically inert, waterproof rod compatible with the sealant used. <br /> The sealant shall be applied according to the manufacturer recommendations and as directed <br /> by the Engineer. Excess sealant should be cleaned up immediately. <br /> Method of Measurement: This work will be measured for payment in place in feet. ' <br /> Basis of Payment: The work specified herein, as shown on the plans and as directed by the , <br /> Engineer, shall be paid for at the contract unit price per FOOT for SLOPE WALL CRACK <br /> SEALING. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.