My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-29 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-29 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:52:20 AM
Creation date
2/8/2024 3:56:54 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-09
Res Ord Title
R2024-09 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bros., Inc. dba Sangamo Construction Company and Appropriating Motor Fuel Tax Funds for the West Mound Road Bridge over Stevens Creek
Department
Public Works
Approved Date
2/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rMound Road <br /> Over Stevens Creek <br /> Section 19-00935-00-BR <br /> ' SN 058-3062 <br /> City of Decatur <br /> SELF-CONSOLIDATING CONCRETE AND SHOTCRETE <br /> The Contractor shall utilize Self-Consolidating Concrete (according to GBSP 53 "Structural <br /> ' Repair of Concrete") to pour concrete repairs from ends of pier caps beyond the fascia beams, <br /> for areas where temporary shoring and cribbing is required to support deck beams while pier <br /> cap tops are repaired. Since the pier cap tops are bearing support areas under the fabric <br /> bearing pads, maintaining the structural integrity of these regions is critical. Specifically, Self- <br /> Consolidating Concrete shall be according to Note 1 and Note 4 of GBSP 53 "Structural Repair <br /> of Concrete". <br /> ' With approval of the City's Resident Engineer, High Performance Shotcrete (according to GBSP <br /> 53 "Structural Repair of Concrete") may be utilized for pier repair areas other than the tops of <br /> pier caps where Self-Consolidating Concrete is required. Specifically, High Performance <br /> ' Shotcrete shall be according to Note 5 and Note 6 of GBSP 53 "Structural Repair of Concrete". <br /> UTILITIES <br /> ' The Contractor shall take all precautions necessary to protect the property of the various public <br /> and private utilities which may be located underground or above ground, at or adjacent to the <br /> site of this improvement. The Contractor shall repair or replace at his/her own expense, or bear <br /> the cost to repair or replace, any utility property that has been damaged through his/her <br /> negligence. The procedures and specifications of repair will be in accordance with the <br /> regulations of and/or policy of the affected utility. <br /> The adjustment and/or relocation of the private utilities will be the responsibility of the utility <br /> companies involved. It is possible that such adjustments may be underway during the <br /> construction of this contract. In such an event, the Contractor shall cooperate with the various <br /> agencies involved in accordance with Article 105.07 of the Standard Specifications. <br /> ' The Contractor's attention is directed to the fact that there exists within the State of Illinois a <br /> Joint Utility Locating Information for Excavators (J.U.L.I.E.) System. All utility companies and <br /> municipalities are a part of this system. <br /> ' The Contractor shall contact the J.U.L.I.E. at (800) 892-0123 a minimum of forty-eight hours in <br /> advance of any excavation work. The political name of the township where the work is located, <br /> as shown on the cover sheet, along with other location information such as the land section and <br /> quarter section, will be required by J.U.L.I.E. at the time of the call. <br /> It is understood and agreed the Contractor has considered in his bid all the permanent and <br /> temporary utility appurtenances in their present or relocated positions. <br /> ' 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.