My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-97 Resolution Accepting the Bid and Authorizing the Execution of a Construction Contract with Lourash and Mahannah Excavation, LLC for the Oakley Sediment Basin Drainage Improvements, City Project 2022-04
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-97 Resolution Accepting the Bid and Authorizing the Execution of a Construction Contract with Lourash and Mahannah Excavation, LLC for the Oakley Sediment Basin Drainage Improvements, City Project 2022-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2024 12:53:46 PM
Creation date
4/3/2024 4:46:03 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-97
Res Ord Title
R2024-97 Resolution Accepting the Bid and Authorizing the Execution of a Construction Contract with Lourash and Mahannah Excavation, LLC for the Oakley Sediment Basin Drainage Improvements, City Project 2022-04
Department
Public Works
Approved Date
4/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> rContractorQ uestions and Answers <br /> Oakley Sediment Basin 2024 Drainage Improvements <br /> City Project 2022-04 <br /> rQuestions, Responses and Additional Information - Compiled March 13, 2024 <br /> r <br /> 1. What is the plan for the spoils from the ditches? Spoil should be either piled <br /> against the exterior berms or along the ditches. New berms created by the spoil <br /> should be shaped to be traversable by future equipment and should not be so steep as <br /> to be dangerous to equipment. Additionally, there should be a drainage point every <br /> r100' to 200' along any spoil berms to let surface water flow towards the ditches. <br /> 2. What should be done with trees? The contractor may remove any trees they deem <br /> necessary for the project. Trees should be placed in several small piles as opposed to <br /> ' fewer, larger piles. There is no need to burn or dispose of the downed trees. <br /> 3. When is the expected time of year when the current surface water dries? There <br /> are wet or damp locations at all times of the year. In 2023, the surface was dry <br /> enough in the northwest subbasin to plant an agriculture crop in late May or early <br /> June. The farm operation used full size equipment. This should not be interpreted as a <br /> r statement that the project will be in the same condition this year, as it will be greatly <br /> impacted by precipitation, sun, and wind. <br /> 4. How far from the exterior berms are the adjacent ditches to be? Locations are <br /> detailed in the engineered plans. Ditches should not be placed so close to any existing <br /> berm that the side of the berm is made steeper or increases erosion of the berm. Along <br /> r the south exterior berm, there is an existing ditch that is currently too close to the <br /> exterior berm. Spoil should be placed along that exterior berm and the new ditch will <br /> be further to the interior. <br /> r 5. What is the depth of the sediment? The bottom of the polishing basin is a close <br /> approximation of the original grade of the site. Everything above that elevation is <br /> sediment. <br /> 6. Other Projects. There are at least two additional projects occurring within the entire <br /> site either outside or inside the exterior berms. It is not anticipated that either of those <br /> will have any impact on the completion of this project. Contractors may use the north <br /> ' gate and the gravel road that proceeds west from that location to load and unload <br /> equipment,but the gate,ramp, and road cannot be blocked for an extended period. <br /> r This site is a limited access location. The contractor will be required to supply their <br /> own pad lock and"chain lock"the locks to allow all other parties access. The <br /> contractor will have to coordinate locking and unlocking the gate with participants of <br /> ' the other projects and city staff. It is expected the gate will be locked every night. <br /> 7. Farming. Some exterior portions of the site are farmed but should have little impact <br /> on this project. There is a possibility of hemp farming inside the berm, but the <br /> 1 <br /> ' 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.