My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-97 Resolution Accepting the Bid and Authorizing the Execution of a Construction Contract with Lourash and Mahannah Excavation, LLC for the Oakley Sediment Basin Drainage Improvements, City Project 2022-04
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-97 Resolution Accepting the Bid and Authorizing the Execution of a Construction Contract with Lourash and Mahannah Excavation, LLC for the Oakley Sediment Basin Drainage Improvements, City Project 2022-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2024 12:53:46 PM
Creation date
4/3/2024 4:46:03 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-97
Res Ord Title
R2024-97 Resolution Accepting the Bid and Authorizing the Execution of a Construction Contract with Lourash and Mahannah Excavation, LLC for the Oakley Sediment Basin Drainage Improvements, City Project 2022-04
Department
Public Works
Approved Date
4/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
farming operation has been informed they will have to accommodate the work and <br /> space associated with this project. We ask that the contractor to coordinated with the <br /> farming operation if the need arises and to practice safe practices if farming staff are <br /> working in the vicinity. <br /> 8. How many access ramps may be constructed to access the lower elevations of the <br /> interior? The plan calls for two permanent ramps to be constructed with culverts to <br /> allow for water flow under them. Contractors may construct any further interior <br /> access ramps as they see fit. Additional access ramps must not impede the flow of <br /> water and must have a culvert underneath. Contractors do not have to remove any <br /> additional properly constructed access ramps if they do not wish. <br /> 9. Do flow lines of the ditches have to follow the precise GPS locations?No. If all <br /> the other concerns of distances from drivable berms (see question 4) are satisfied,the <br /> contractor may deviate slightly. Precise lines of the ditches are not critical, but greater <br /> attention should be paid to the elevation, depth, width, and slope of the ditches. <br /> 10. Prescribed Burn. The City intends to conduct a prescribed burn soon. If that burn <br /> occurs before the deadline for bids, the City will send notification and bidders may <br /> view the site post-burn by appointment. <br /> 11. Pipes. There is a selection of unused pipes from previous projects located near the <br /> north gate. Contractors may use that pipe, free of cost, for culverts or for drainage <br /> purposes. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.