R2024-102 Resolution Former Coppenbarger School
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-102 Resolution Former Coppenbarger School
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 9:51:01 AM
Creation date
4/19/2024 9:50:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-102
Res Ord Title
R2024-102 Resolution Authorizing the Execution of an Agreement with Ezell Excavating Inc. for the Demolition of 1222 E. Grand (Former Durfee School) and 1500 E. Condit (Former Coppenbarger School)
Department
Econ and Com Dev
Approved Date
4/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Decatur <br /> 1300 <br /> ATTACHMENT 1:RECOMMENDED ACTION <br /> Description of ACM General Location of ACM Desi nation <br /> Insulation on 12"Diameter Pipe Fittings Power House(Coal Chute) TiA <br /> Insulation on 12"to 24"Elbows 24'AFF Power House f Boiler Room) T1A <br /> Aircell Pipe Insulation 12'Above Finished Floor Power House (Southwest Wall of Boiler Room) TPA <br /> Heat Exchanger Insulation on Vertical Tank Power House(Middle of West Wall in Boiler Room) TBA <br /> Asbestos-Contaminated Demolition Debris Gymnasium Addition Presumed <br /> Asbestos-Contaminated Demolition Debris North 3-Story Classroom Addition Presumed <br /> Asbestos-Contaminated Demolition Debris Original Structure Presumed <br /> Asbestos-Contaminated Demolition Debris Power House if Deemed Unsafe by OCP Confirmed <br /> (Pipe Fitting Insulation in Power House)-This is a Thermal Insulating Material(TSI) located on <br /> abandoned steam supply and return plumbing systems inside the Power House.The Power House is a <br /> noncontiguous building that supplied the Main Structure with steam and heated water.The Power House was <br /> inspected for friable and nonfriable asbestos-containing materials(ACMs).Based on the walk-through, the <br /> fitting insulation that was identified was labeled and therefore is a confirmed ACM. There are about four 12 inch <br /> elbows in the coal chute and about twentysix 12 to 24 inch elbows in the boiler room;however users of this <br /> report shall rely on their own measurements for actionable work.The fittings in the boiler room are elevated <br /> about 24 feet above the basement floor.The Power House is accessible,but in light of Structural Engineer's <br /> Report the OSHA Competent Person(OCP)for the Abatement Contractor shall determine if areas are safe to <br /> work in; if deemed unsafe by the OCP,all demolition debris is presumed to be asbestos-contaminated waste and <br /> demolition must proceed per the recommendations of this Attachment.If the OCP deems the Power House safe <br /> to work in then removal should be performed by Illinois Licensed Asbestos Workers in conformance with the <br /> training requirements of ASHARA and IDPH. <br /> i (Pipe Insulation in Power House)-This material is aircell,a Thermal Insulating Material(TSI)located on <br /> abandoned steam supply and return plumbing systems inside the Power House.The Power House is a <br /> noncontiguous building that supplied the Main Structure with steam and heated water.The Power House was <br /> inspected for friable and nonfriable asbestos-containing materials(ACMs).Based on the walk-through, the pipe <br /> insulation that was identified was labeled and therefore is a confirmed ACM. About 60 feet of insulation was <br /> identified;however users of this report shall rely on their own measurements for actionable work.The aircell is <br /> on piping elevated about 12 feet above the basement floor.The Power House is accessible,but in light of <br /> Structural Engineer's Report the OSHA Competent Person(OCP)for the Abatement Contractor shall determine <br /> if areas are safe to work in;if deemed unsafe by the OCP,all demolition debris is presumed to be asbestos- <br /> contaminated waste and demolition must proceed per the recommendations of this Attachment.If the OCP <br /> deems the Power House safe to work in then removal should be performed by Illinois Licensed Asbestos <br /> Workers in conformance with the training requirements of ASHARA and IDPH. <br /> Attachment 11 Page ATT i- 11 Coppenbarger School Building NESHAP Report 2 2023 CourticeGrason LLC.All Rights Reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.