Laserfiche WebLink
City of Decatur <br /> I ititi V:{si i_n?iti'.t <br /> ATTACHMENT 1:RECOMMENDED ACTION <br /> TB (Heat Exchanger Tank Insulation)-This material is mag-block on a wire mesh,a Thermal Insulating <br /> Material(TSI) located on a vertical heat exchanger on the west side of the boiler room in the Power House.The <br /> Power House is a noncontiguous building that supplied the Main Structure with steam and heated water.The <br /> Power House was inspected for friable and nonfriable asbestos-containing materials(ACMs). Based on the walk- <br /> through, the tank insulation that was identified was labeled and therefore is a confirmed ACM About 125 square <br /> feet of insulation was identified;however users of this report shall rely on their own measurements for <br /> actionable work.The mag-block is on a vertical tank that reaches approximately 8 feet in height.The Power <br /> House is accessible,but in light of Structural Engineer's Report the OSHA Competent Person(OCP)for the <br /> Abatement Contractor shall determine if areas are safe to work in; if deemed unsafe by the OCP,all demolition <br /> debris is presumed to be asbestos-contaminated waste and demolition must proceed per the recommendations of <br /> this Attachment. If the OCP deems the Power House safe to work in then removal should be performed by <br /> Illinois Licensed Asbestos Workers in conformance with the training requirements of ASHARA and IDPH. <br /> Asbestos Contaminated Dernolitioar Debris in itiiriin St,uctu a(Presumed)-The Main Structure consists of <br /> the Original Building,a 2-Story Gymnasium Addition,and a 3-Story Classroom Addition.The City of Decatur <br /> has condemned the building and it will be demolished;it is unsafe because of failed roofing systems,exposures <br /> to animal wastes including rodent and bird droppings,and fall hazards exists throughout the building due to wet <br /> floors,torn floor coverings,holes in floors,and missing hand and guard rails. The Structural Engineer's Report <br /> in Attachment 5 presupposes a heightened risk to human health and safety upon entry into the building.As the <br /> Main Structure could not be inspected,all demolition debris is presumed to be asbestos-contaminated waste and <br /> demolition must proceed per the recommendations below.These recommendations extend to the Power House if <br /> the OCP deems that it is unsafe for asbestos abatement work. <br /> Recommended Action for Demolition <br /> 1.Submit the TEPA 14-Calendar Day Notification of Demolition. <br /> 2.Attach the City of Decatur Condemnation Letter and the Structural Engineer's Report to Notification. <br /> 3.Keep a copy of the Asbestos NESHAP Report on site during demolition. <br /> 4. Prepare a Site Safety Plan and a Plan on how to control water runoff and airborne emissions at the site <br /> 5.The above Plan shall be prepared by the Demolition Contractor. <br /> 6.An AsbestosAbatement Contractor(AAC)Supervisor shall be present during demolition. <br /> 7.The AAC shall also have a laborer and equipment on site for Response Action Work when needed. <br /> 8.An Air Sampling Professional shall perform monitoring to check effectiveness of plan submitted in 4 above. <br /> 9.Perform all demolition work under wet methods and keep all debris covered while in transit to landfill. <br /> 10. Retain trip tickets,landfill disposal receipts,and manifests showing proper disposal of presume ACM debris. <br /> 11. Ensure exposure monitoring is performed on Equipment Operators and the Demolition Contractor's forces. <br /> 12.The exposure monitoring in 11 above may be suspended if a Negative Exposure Assessment is cited. <br /> 13.At completion of site work take a representative number of clearance soil samples to document site closure. <br /> 14.A final report documenting site activities and monitoring shall be prepared and be submitted to the City. <br /> 15. Include manifests and regulatory submittals in 14 above so it can be used in case of a FOIA Request. <br /> Attachment 11 Page ATT 1-2 1 Coppenbarger School Building NESHAP Report g,2023 CourriceGrason LLC.All Rights Reserved <br />