Laserfiche WebLink
8. Record Drawings. Using Contractor and owner initiated drawing markups and <br /> measurements, make AutoCAD revisions, develop electronic and hard copy record <br /> drawings. <br /> 9. Limited Construction Observation. Construction observation shall not be full time <br /> but will be on a part time basis as needed for inspection (not approval) of the progress <br /> of the work. <br /> 1256 manhours are estimated for Limited Construction Observation. <br /> Not Included in Scope of Services <br /> 1. Full time Construction Observation. <br /> 2. Weekly Coordination Meetings. <br /> 3. Monthly Pay/Progress Meetings. <br /> Estimated Engineering Fee <br /> The estimated engineering fee for the above scope of services is $350,000.00 <br /> 2 <br /> Last Revised: 2/03/2022 <br />