My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-111 Resolution Authorizing an Agreement with Ecosystem Services Exchange, for Services with the Regional Conservation Partnership Program
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-111 Resolution Authorizing an Agreement with Ecosystem Services Exchange, for Services with the Regional Conservation Partnership Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 10:08:45 AM
Creation date
4/19/2024 10:08:42 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-111
Res Ord Title
R2024-111 Resolution Authorizing an Agreement with Ecosystem Services Exchange, for Services with the Regional Conservation Partnership Program
Department
Public Works
Approved Date
4/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> Under this agreement with the City of Decatur,ESE's role will be limited to the completion of <br /> conservation drainage practice designs for the project-specified practices. These designs will meet the <br /> requirements of the USDA Natural Resources Conservation Service(MRCS)Design&Implementation <br /> Activity 164(DIA 164),"Improved Management of Drainage Water Design". A DIA 164 is used to <br /> support a farmer's use of a certified Technical Service Provider(TSP)for all aspects of site assessment <br /> through planning to final"shovel ready"design for the installation of manual and automated drainage <br /> water management,saturated buffers,and denitrifying bioreactors. An ESE-developed DIA 164 meets all <br /> NRCS requirements and enables a farmer to receive a payment from EQIP,RCPP,or another eligible <br /> conservation program for this completed plan/design. NRCS has estimated the full cost of the <br /> development of a DIA 164 for fields with existing tile maps and fields without existing tile maps. The <br /> cost of developing a DIA 164 is the same for a manual or automated drainage water management system, <br /> a saturated buffer,or a denitrifying bioreactor. <br /> As producer's signup for participation in this RCPP Project for the eligible conservation drainage <br /> practices,ESE will work with them to complete planning and design activities consistent with the NRCS <br /> DIA 164. ESE has been provided an estimate of 70 practices needing DIA 164s at the amount of 14 per <br /> year for each of five years. ESE estimates that 40 of these sites for the development of DIA 164s will <br /> have a tile map available to use in the design process, and 30 will have no tile map available for use in the <br /> design process. This breakdown is an estimate only and the actual breakdown will be based on producer <br /> signup and whether or not they can provide a suitable tile map or not for use in the design process. NRCS <br /> has determined it is more costly to develop a DIA 164 in the absence of a tile map and this is reflected in <br /> the Illinois NRCS practice scenarios posted online.For federal fiscal year 2024,NRCS's estimate of the <br /> 100 percent(full)cost for a DIA 164 with tile map is$6,839.36,whereas the 100 percent(full)cost <br /> estimate for a DIA 164 without a tile map is$9,315.76. The published cost estimates are the basis for <br /> how NRCS provides financial assistance for a DIA 164 under EQIP and RCPP. These cost estimates are <br /> updated annually on a federal fiscal year basis to account for cost changes because of labor and other <br /> associated costs. <br /> The DIA 164 is the site-specific prescription developed by ESE(NRCS certified Technical Service <br /> Provider)that helps the farmer to achieve the benefits of the designated conservation drainage practices- <br /> -manual and automated drainage water management,saturated buffers,and denitrifying bioreactors. <br /> Costs accounted for in developing a DIA 164 include a site assessment for feasibility,a site investigation <br /> and survey to establish design parameters, and the development of the actual design and its specifications <br /> for practice installation. ESE also includes an Operation and Maintenance Plan for the practice to be used <br /> by the producer after its installation. <br /> ESE will scrutinize each potential practice plan/design for optimized cost-effectiveness and functionality. <br /> For instance,a drainage water management system(automated or manual)needs to account for field <br /> slope,drainage volume,and other conditions,and a saturated buffer needs to be a certain length to be <br /> worthy of construction because of high contractor deployment and mobilization costs. Similarly, <br /> denitrifying bioreactors should be chosen where the design flow and nitrate load is high enough to justify <br /> the construction costs. ESE frequently combines multiple adjacent outlets into a single practice to <br />
The URL can be used to link to this page
Your browser does not support the video tag.