My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-111 Resolution Authorizing an Agreement with Ecosystem Services Exchange, for Services with the Regional Conservation Partnership Program
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-111 Resolution Authorizing an Agreement with Ecosystem Services Exchange, for Services with the Regional Conservation Partnership Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 10:08:45 AM
Creation date
4/19/2024 10:08:42 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-111
Res Ord Title
R2024-111 Resolution Authorizing an Agreement with Ecosystem Services Exchange, for Services with the Regional Conservation Partnership Program
Department
Public Works
Approved Date
4/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
increase the benefit-to-cost ratio.All designs will include the use of LiDAR and an assessment of soil <br /> suitability for the proposed practice. <br /> ESE will conduct remote site and feasibility assessments and make recommendations for the suitability of <br /> a drainage water management system(automated or manual), saturated buffers,and denitrifying <br /> bioreactors for each outlet identified by program participants and estimate the area of impact. ESE will <br /> communicate with participants regarding potential benefits,cost-effectiveness,and the overall <br /> functionality of each of the outlets in question. <br /> ESE will develop comprehensive designs,construction cost estimates, and construction plans for each <br /> practice/site/outlet. ESE ensures that NRCS conservation practice standards are adhered to. The <br /> following products will be combined in a single package upon completion: <br /> • Plans and specification for selected conservation drainage practices in accordances with Illinois <br /> NRCS conservation practice standards(CPSs)for 554, 587, 604, and 605. <br /> • Operation and Maintenance Plan for the selected conservation drainage practices in accordance <br /> with Illinois NRCS CPSs 554, 587, 604, and 605. <br /> • Engineer's estimate of probable construction costs for the selected conservation drainage <br /> practices. <br /> • Documentation/certifications required for floodplain permitting. <br /> • Checkout sheet for as-built documentation. <br /> ESE is committed to achieving all of the applicable project schedule dates for its deliverables,and to <br /> ensuring its timely and thorough communication with the City of Decatur. <br /> ESE's Budget Justification <br /> NRCS has determined it is more costly to develop a DIA 164 in the absence of a tile map and this is <br /> reflected in the Illinois NRCS practice scenarios posted online. For federal fiscal year 2024,NRCS's <br /> estimate of the 100 percent(full)cost for a DIA 164 with tile map is$6,839.36,whereas the 100 percent <br /> (full)cost estimate for a DIA 164 without a tile map is$9,315.76. The published cost estimates are the <br /> basis for how NRCS provides financial assistance for a DIA 164 under EQIP and RCPP. These cost <br /> estimates are updated annually on a federal fiscal year basis to account for cost changes because of labor <br /> and other associated costs. <br /> The proposed project budget for ESE is$469,792.52 to complete the development and handoff to <br /> the City of Decatur for 70 DIA 164s. This amount is based on ESE applying a 20 percent discount <br /> to the NRCS full cost,thereby invoicing the City of Decatur for only 80 percent of the NRCS full <br /> cost. This will reduce ESE's total charge for the completion of 70 DIA 164s from$587,240.65 to <br /> $469,792.52--a savings of at least$117.448.13 to the City of Decatur. <br /> ESE will have responsibility for DIA 164 activities of the project--remote site assessments, on-site <br /> investigations and engineering surveys,planning, and design. ESE anticipates using sub agreement(s) <br /> with local SWCDs to act on ESE's behalf to conduct most of the on-site investigations and engineering <br /> surveys. This will improve efficiency and ensure ESE does not have to request a travel budget from the <br /> City of Decatur to support on-site field work. Rather,ESE will perform its design work remotely with the <br />
The URL can be used to link to this page
Your browser does not support the video tag.