My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 2:20:32 PM
Creation date
5/21/2024 2:20:28 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-225
Res Ord Title
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
Department
Public Works
Approved Date
5/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br /> 11 <br /> CONCENTRIC <br /> INTEGRATION <br /> f. Quantity one (1)Allen-Bradley Panelview 5510 12"Wide Touch Display. <br /> g. Quantity one(1) UPS with relay interface card. <br /> h. Quantity two (2) PULS redundant DC power supplies. <br /> i. Quantity one (1)GE Orbit radio with dual 450mHz radio and cellular modem. <br /> j. Quantity one(1) cellular antenna. <br /> 11. Chlorine Dioxide control components as follows: <br /> a. Quantity one (1) Allen-Bradley 5069-L310ER PLC processor. <br /> b. Quantity one (1)Allen-Bradley 5069-IB16 24VDC digital input card. <br /> c. Quantity one (1)Allen-Bradley 5069-IF8 eight channel 4-20mA analog input card. <br /> d. Quantity one (1)Allen-Bradley 5069-OW16 relay output card. <br /> e. Quantity one (1)Allen-Bradley 5069-OW41 isolated relay output card. <br /> f. Quantity two (2)Allen-Bradley 5069-Of4 four channel 4-20mA analog output cards. <br /> g. Quantity one(1)Allen-Bradley Panelview 5510 12"Wide Touch Display. <br /> 12. Dam Radio as follows: <br /> a. Quantity one (1) PULS DC power supply. <br /> b. Quantity one (1) GE Orbit radio with dual 450mHz radio and cellular modem. <br /> c. Quantity one (1)cellular antenna. <br /> Concentric will also provide any miscellaneous control panel components(Patch cables,wire,mounting hardware, <br /> etc.) as required for a complete installation. <br /> 13. SCADA Equipment <br /> a. Quantity one(1) Inductive Automation: Ignition Platform, Ignition Unlimited Perspective Module,Tag <br /> Historian Module, Reporting Module, SQL Bridge Module, Alarming Module, SMS Module, Voice <br /> Module, Enterprise Management Module Licensing. One (1)year of Ignition BasicCare <br /> b. Quantity one(1) Inductive Automation: Redundant Licensing for above Modules <br /> c. Quantity one (1) Dell Computer with minimum specifications as follows: <br /> a. 256GB solid state primary Hard Drive for OS <br /> b. 1TB HDD secondary hard drive for file storage and SQL files <br /> c. 16GB RAM <br /> d. Quad Core i7 or greater processor <br /> e. Windows 11 <br /> d. Quantity two (2) Microsoft SQL Server license (with five (5) user Cals). <br /> The City is responsible for the following: <br /> 1. Verizon contract and sim cards for the cellular modems (provided by Verizon under the direction of the <br /> city). <br /> Project#0230159.00 Page No.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.