My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 2:20:32 PM
Creation date
5/21/2024 2:20:28 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-225
Res Ord Title
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
Department
Public Works
Approved Date
5/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
411 <br /> CONCENTRIC <br /> I N T E G R A T I O N <br /> Labor <br /> Proiect Management <br /> 1. Plan, schedule, and coordinate the activities that must be performed to complete the Project. <br /> 2. Coordinate an onsite kickoff meeting prior to start of work. <br /> 3. Provide Monthly project status updates via email. <br /> PLC Modernizations: Programming and Startup <br /> 1. Replace the following existing control hardware with the new hardware as listed above: <br /> a. MRCP—Master Radio Control Panel <br /> b. SCC12—Williams Street Reservoir <br /> c. SCC14—Fairview Level Station <br /> d. SCC15— Friends Creek Level Station <br /> e. SCC16—Long Creek Level Station <br /> f. SCC17—Monticello Level Station <br /> g. SCC18—Division Street Tank Valve Vault <br /> h. SCC19—Garfield Tank Valve Vault <br /> i. SCC20—Brush College Tap <br /> j. SCC22— Franklin St.Tank <br /> k. BPS—Booster Pump Station <br /> I. Chlorine Dioxide system <br /> m. Dam <br /> 2. Perform all PLC program migration, startup, and testing for each PLC (items b-1) mentioned above. The <br /> existing PLC code functionality will not change, it will simply be migrated from the old to new hardware. <br /> The PLC firmware used will be the most current version supported. <br /> 3. Migrate the master remote communications from the temporary communications master into recently <br /> upgraded SCC1 ControlLogix processor. Remap all messaging to route SCC19 repeater stations to <br /> communicate directly to SCC1 rather than relaying through SCC19's PLC. <br /> 4. Program a new operator interface terminal (OIT)with control screens to control and monitor the Booster <br /> Pump Station (BPS). The OIT will replace functionality of existing physical switches and buttons being <br /> eliminated by the upgraded control panel.The OIT will also provide local visualization of the BPS operation <br /> and alarm conditions. <br /> 5. Migrate the existing Chlorine Dioxide system operator interface terminal (OIT) to an Allen-Bradley <br /> Panelview 5000. The existing OIT functionality will not change, it will simply be migrated from the old to <br /> new hardware. <br /> Project#0230159.00 Page No.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.