My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 2:20:32 PM
Creation date
5/21/2024 2:20:28 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-225
Res Ord Title
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
Department
Public Works
Approved Date
5/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
411 <br /> CONCENTRIC <br /> INTEGRATI0N <br /> 6. Confirm successful program migration, radio communications,and cellular failover through the testing of <br /> status and control signals. Document results using a Field Device Report checkout form. <br /> Communication Modifications <br /> 1. The routers will be configured to join an existing private cellular network or a new private cellular SCADA <br /> network. Concentric will work with the City's IT to determine the best course of action. New IP addressing <br /> will be required and will be coordinated with the City's IT department as well as the Water department <br /> maintenance personnel. <br /> a. Coordinate with City IT department to determine cellular network requirements. <br /> 2. Perform pre-programming/configuration of the radios within Concentric's offices before deployment. <br /> a. Radio communications will be configured as the primary communications route with cellular as <br /> failover route. <br /> 3. Perform onsite commissioning to swap old 2FF SIM card information with new Micro-SIM 3FF SIM cards. <br /> 4. Provide, install, and configure a Cisco Catalyst 8200-11\14T for transmitting data from the SCC1 PLC to the <br /> City's private Verizon cellular network in the event of radio communication loss. <br /> SCADA Modifications <br /> 1. Standards Development <br /> a. Conduct up to three (3) meetings at up to four (4) hours each with water department staff to review <br /> and determine the graphics style that shall be used for SCADA graphic development. <br /> i. Modify Concentric standards to meet City's needs and requirements, as necessary, and as <br /> determined by the review meetings. <br /> b. Conduct up to two (2) meetings at up to four(4) hours each with Water department staff, to review <br /> and determine the criteria for what datapoints in SCADA shall be historized. <br /> c. Conduct up to two (2) meetings at up to four (4) hours each with Water department staff to review <br /> and determine the standard for what types of alarm conditions shall be configured within SCADA,and <br /> how/when an alarm requires external notification. <br /> i. External notification is hereby defined as notifications outside the confines of the SCADA software <br /> graphical displays. Which may pertain to such items as alarm horns, light strobes, phone call <br /> notifications,text message notifications,email notifications,etc. <br /> 2. Provision, setup, configure, install one (1) new virtual SCADA server that will be hosted by the city's <br /> existing SCADA virtual host server located at the water treatment plant. <br /> 3. Setup,configure, install one (1) new desktop computer. <br /> Project t#0230159.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.