My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 2:20:32 PM
Creation date
5/21/2024 2:20:28 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-225
Res Ord Title
R2024-225 Resolution Authorizing an Agreement with Concentric Integration, LLC for Water Facilities PLC Upgrades, City Project 2024-29
Department
Public Works
Approved Date
5/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O <br /> 11 <br /> CONCENTRIC <br /> INTEGRATION <br /> 4. Install and configure the Ignition SCADA software on the Primary and Redundant SCADA servers: <br /> a. The Ignition Primary server will be installed and configured on the newly configured virtual SCADA <br /> server. <br /> b. The Ignition Secondary server will be installed and configured on the new desktop computer. <br /> c. Configure Ignition's Allen-Bradley device driver to communicate and poll information from all PLCs <br /> that the current iFix system is accessing for data. <br /> d. Configure datapoints (tags) in Ignition to maintain existing monitoring and control provided within <br /> the existing iFix SCADA system. <br /> 5. Migrate the agreed upon alarms during the SCADA standards development meeting from section 1c above <br /> into Ignition. <br /> 6. Provide visibility and control for the following sections of the existing iFix SCADA system and the <br /> corresponding datapoints <br /> a. Plant overview screen. <br /> b. Operator(Clipboard)screen. <br /> c. Clarifier and claricone system. <br /> d. Chemical feed. <br /> e. Transfer and high Service Pumps. <br /> f. Intrusion configuration <br /> g. Remote sites as follows: <br /> i. SCC12—Williams Street Reservoir <br /> ii. SCC14—Fairview Level Station <br /> iii. SCC15—Friends Creek Level Station <br /> iv. SCC16—Long Creek Level Station <br /> v. SCC17—Monticello Level Station <br /> vi. SCC18—Division Street Tank Valve Vault <br /> vii. SCC19—Garfield Tank Valve Vault <br /> viii. SCC20—Brush College Tap <br /> ix. SCC21-ADM Flows <br /> x. SCC22—Franklin St.Tank <br /> xi. BPS—Booster Pump Station <br /> Project#0230159.00 Page No.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.