Laserfiche WebLink
mounting base / frame, 2.3-gallons drip-tray, sch 80 PVC piping and ball valves, <br /> PVC back pressure valve, flow sensor, flow indicator, inlet / outlet connection <br /> tubing, calibration cylinder, pressure gauge, pressure switch. and terminal <br /> 1in accordance with the included specification. <br /> 3. Duplex peristaltic hose pumps skid for Fluoride feed. The skid shall be pre-piped <br /> and pre-assembled including peristaltic tube pumps, polyethylene mounting base <br /> / frame, 2.3-gallons drip-tray, sch 80 PVC piping and ball valves, PVC back <br /> pressure valve, flow sensor, flow indicator, inlet / outlet connection tubing, <br /> calibration cylinder, pressure gauge, pressure switch, u,,, diaphragm operated <br /> anti-siphon valves on the pumps discharge and terminal b( in accordance with <br /> the included specification. <br /> 4. Duplex peristaltic hose pumps skid for Sodium Hydroxide feed. The skid shall be <br /> pre-piped and pre-assembled including peristaltic tube pumps, polyethylene <br /> mounting base / frame, 2.3-gallons drip-tray, sch 80 PVC piping and diaphragm <br /> valves, PVC back pressure valve, flow sensor, flow indicator, inlet / outlet <br /> connection tubing, calibration cylinder, pressure gauge,_anc;, pressure switch <br /> ' in accordance with the included specification. <br /> 5. Four (4) peristaltic tube pumps for Cationic Polymer feed. Each pump shall be <br /> installed on existing Polyblend skids and shall be powered and controlled from <br /> existing Polyblend control panels. Provide base attached to the skid to mount the <br /> pump. <br /> ' B. Related Sections: <br /> 1. Section 01 33 00 — Submittal Procedures. <br /> 2. Section 01 43 50 — Manufacturer's Services <br /> 3. Section 01 78 23 — Operation and Maintenance Data <br /> 4. Section 40 05 13 — Pipelines Liquid Process Piping <br /> 5. Division 26 — Electrical <br /> 1.03 SUBMITTALS <br /> 1 A. Submittals shall be made in accordance with Section 01 33 00 — Submittal Procedures <br /> and Section 01 78 23 — Operation and Maintenance Data. <br /> B. Complete fabrication, assembly, foundation, and installation drawings, pump curves, and <br /> operation, maintenance and storage instructions, together with detailed specifications <br /> and data covering materials used, pump and motor assemblies, parts, devices and other <br /> accessories forming a part of the equipment furnished, shall be submitted for review for <br /> each separate pumping unit. Data and specifications for the equipment shall include, <br /> but not be limited to, the following: <br /> 1. Manufacturer's literature, illustrations, specifications and engineering data <br /> ' including dimensions, materials, size, weight, performance data showing, flow <br /> rate, discharge head, turndown, stroke rate, motor horsepower and speed. <br /> 2. All calculations on pump selection, pipe sizing, etc. <br /> 3. Data sheets on chemical compatibility of the wet end materials being furnished <br /> for each chemical. <br /> ' 4. Shop drawings showing fabrication, assembly, installation and wiring diagrams. <br /> Wiring diagrams shall conform to JIC Standards. <br /> C. Manufacturer's qualifications shall be submitted in accordance with the requirements of <br /> Part 1.04. <br />