My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-103 Resolution Accepting the Bid and Authorizing the Execution of a Construction Contract with Henson Robinson Company, Inc. for the Chemical Feed Upgrades and Bulk Water Upgrades
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-103 Resolution Accepting the Bid and Authorizing the Execution of a Construction Contract with Henson Robinson Company, Inc. for the Chemical Feed Upgrades and Bulk Water Upgrades
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2024 12:19:47 PM
Creation date
5/22/2024 11:08:55 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-103
Res Ord Title
R2024-103 Resolution Accepting the Bid and Authorizing the Execution of a Construction Contract with Henson Robinson Company, Inc. for the Chemical Feed Upgrades and Bulk Water Upgrades
Department
Public Works
Approved Date
5/22/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> D. Shop test reports shall be submitted in accordance with the requirements of Part 1.05. <br /> E. Field test reports shall be submitted in accordance with the requirements of Part 3.04. <br /> 1 F. Complete installation, operation and maintenance manuals including copies of all <br /> approved shop drawings shall be submitted, as required by Section 01 78 23 — <br /> Operation and Maintenance Data. <br /> 1.04 QUALITY ASSURANCE <br /> A. The manufacturer shall have experience in manufacturing peristaltic chemical metering <br /> ' pump of the same size or larger size to the units specified for a minimum of ten (10) <br /> years. <br /> ' B. All pumps provided under this section shall be obtained from a single supplier or <br /> manufacturer who, with the vendor, shall assume full responsibility for the completeness <br /> and proper operation of the chemical feed system. <br /> C. The manufacturer must have a local, authorized service center in the territory where the <br /> pumps are to be installed. The service center shall have trained technicians authorized <br /> to make repairs to all components of the chemical feed skid system. <br /> rD. Pumps shall be produced in compliance with ISO 9001: 2000. <br /> 1.05 PRECONSTRUCTION TESTING <br /> A. To ensure quality and unit responsibility, the actual pumps being provided must be <br /> assembled and tested by the manufacturer at its facility and must be a standard <br /> regularly marketed product of that manufacturer. The manufacturer must have physical <br /> plant, technical and design staff, and fabricating personnel to complete the work <br /> specified. <br /> 1.06 DELIVERY, STORAGE AND HANDLING <br /> A. Pumps must be stored indoors and delivered to the site protected from the weather. <br /> Note that failure to comply with this requirement will be grounds for rejection of the <br /> equipment as no longer suitable for use. <br /> ' B. Materials must be delivered to the site to ensure uninterrupted progress of the work. <br /> C. Manufacturer's factory representative for the equipment specified must be provided and <br /> present at the site for installation assistance, inspection and certification of the <br /> installation, equipment testing, startup assistance, and training of Owner's personnel as <br /> specified by Section 01 43 50— Manufacturer's Services. <br /> rPART PRODUCTS <br /> 2.01 DESIGN REQUIREMENTS <br /> A. The peristaltic tube pump components shall be designed to convey Polyphosphate <br /> solution (sodium hexametaphosphate)with the following properties. <br /> r1. The concentration shall be 12 percent by weight. <br /> 2. Feed rate range, 4.1 — 11.2 GPH @ 30 psi. <br /> B. The peristaltic tube pump components shall be designed to convey Sodium Bisulfite <br /> solution with the following properties. <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.