5/28/24, 12:45 PM Item Coversheet <br /> I4 1 Ellen and Division Area I Completed in 2018 Completed in 2022 Complete <br /> Farview Park Storm Sewer <br /> On April 27,2023,the City Council approved a motion to start final design of the Oakland and Grand Separation Sewer selecting <br /> the alternative to fully separate the combined sewer. The storm sewer connection is to an existing overflow pipe located in <br /> Fairview Park. The routing of the storm sewer was discussed with the Decatur Park District and the route that had the least impact <br /> on the park and trees was determined to be through the playground area. The City installed 900 feet of pipe this spring ahead of <br /> the Park District's replacement of the playground. <br /> Norfolk Railroad Crossing <br /> The proposed alignment crossing the Norfolk Southern Railroad in Route 48(Farview Ave) State right-of-way. All utility <br /> crossings under railroads require an agreement between the railroad and its owner. The agreement is similar to others and will <br /> allow for the storm sewer to be constructed and maintained. The Norfolk Railroad does not charge a license fee if the utility is in <br /> the ROW and the City will pay for the risk management fee of$1,900 to be added to the master railroad protective liability <br /> insurance policy. <br /> Illinois Environmental Protection Agency(IEPA)State Revolving Loan Program <br /> The IEPA Wastewater and Drinking Water loan programs provide low-interest loans through the State Revolving Fund(SRF). The <br /> SRF includes two loan programs: the Water Pollution Control Loan Program(WPCLP)which funds both wastewater and storm <br /> water projects,and the Public Water Supply Loan Program(PWSLP)for drinking water projects. The current year loan interest <br /> rate is 1.81%. <br /> Project Funding through the Public Water Supply Loan Program <br /> The passage of an ordinance authorizing a loan agreement to borrow funds from the Illinois Public Water Supply Loan Program is <br /> one of the final steps in securing an IEPA low interest loan.The ordinance addresses the funding for the project and assures that the <br /> City is able to repay the loan over a 30-year time period beginning at the substantial completion of the project. The funds included <br /> in the loan request are summarized in the following table: <br /> Work Item Project Estimate <br /> Design Engineering $650,000 <br /> Construction $13,750,000 <br /> Construction Contingency(10%) $1,650,000 <br /> Construction Engineering $450,000 <br /> Total Estimated Project Cost $16,500,000 <br /> Construction Period Interest(1.5%) $247,500 <br /> Sub-Total $16,747,500 <br /> Total Loan Requested $16,500,000 <br /> As is common with the Public Water Supply Loan Program,the actual loan document will not be fully written until a construction <br /> contract has been awarded by the City Council and approved by the IEPA.At that point,the agreement authorized by the attached <br /> ordinance will be signed by the City Manager and the loan activated. The contractor will then be given notice to proceed. <br /> Construction Engineering Services <br /> The IEPA requires that projects being supported by the Public Water Supply Loan Program be provided with project oversight by <br /> qualified resident engineers that are familiar with the water treatment work being proposed.A construction engineering agreement <br /> will be brought to the Mayor and Council at the same time that a construction contract is to be awarded. <br /> SCHEDULE: The anticipated schedule is as follows: <br /> Plans and Specifications Submitted to the IEPA June 2024 <br /> https://decatur.novusagenda.com/agendaweb/CoverSheet.aspx?ItemID=5064 2/3 <br />