My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-269 Resolution Authorizing a Consolidated Rail Infrastructure and Safety Improvement Grant Agreement for Construction Engineering Services for the Improvement of Brush College Road over Faries Parkway and the Norfolk Southern Railroad Tracks
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2024-269 Resolution Authorizing a Consolidated Rail Infrastructure and Safety Improvement Grant Agreement for Construction Engineering Services for the Improvement of Brush College Road over Faries Parkway and the Norfolk Southern Railroad Tracks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2024 10:24:36 AM
Creation date
7/17/2024 10:24:24 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-269
Res Ord Title
R2024-269
Department
Public Works
Approved Date
7/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U.S.Department of Transportation <br /> ChW)e Federal Railroad Administration <br /> ARTICLE 23: ADDITIONAL TERMS AND CONDITIONS <br /> 23.1 Disclaimer of Federal Liability <br /> FRA will not be responsible or liable for any damage to property or any injury to persons that <br /> may arise from, or be incident to, performance or compliance with this Agreement. <br /> 23.2 Environmental Review <br /> (a) Except as authorized by law or under 23 C.F.R. § 771.113(d)(4),the Recipient will not <br /> begin final design activities; acquire real property, construction materials, or equipment, <br /> including rolling stock; begin construction; or take other actions that would have an <br /> adverse environmental impact or limit the choice of reasonable alternatives for the <br /> Project unless and until FRA complies with the National Environmental Policy Act,42 <br /> U.S.C. §4321 et seq. (NEPA), and any other applicable environmental laws and <br /> regulations. In addition,the Recipient will not begin project development that involves <br /> ground disturbing activity prior to FRA compliance with NEPA and any other applicable <br /> environmental laws and regulations. <br /> (b) The Recipient acknowledges that: <br /> (1) FRA's actions under Section 23.2(a) of this Attachment 1 may depend on the <br /> Recipient conducting necessary environmental analyses and submitting necessary <br /> documents to FRA; and <br /> (2) applicable environmental statutes and regulations may require the Recipient <br /> to prepare and submit documents to other Federal,State, and local agencies. <br /> (c) Consistent with 23 C.F.R. § 771.105(a),to the maximum extent practicable and <br /> consistent with Federal law,the Recipient will coordinate all environmental investigations, <br /> reviews, and consultations as a single process. <br /> (f) The activities described in Article 4 of Attachment 2 of this Agreement and other <br /> information described in this Agreement may inform environmental decision-making <br /> processes, but the parties do not intend this Agreement to document the alternatives <br /> under consideration under those processes. If a build alternative is selected that does not <br /> align with Article 4 of Attachment 2 of this Agreement or other information in this <br /> Agreement,then FRA will either: <br /> (1) amend this Agreement under Section 15.1 of this Attachment 1 for <br /> consistency with the selected build alternative; or <br /> (2) if FRA determines that the condition at Section 10.1(a)(5)of this Attachment 1 <br /> is satisfied,terminate this Agreement under Section 10.1(a)(5)of this Attachment <br /> 1; or <br /> (3)take other action as deemed appropriate by FRA. <br /> 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.