My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-273 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Preliminary Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-273 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Preliminary Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 11:39:49 AM
Creation date
8/8/2024 11:39:45 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-273
Res Ord Title
R2024-273 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Preliminary Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow
Department
Public Works
Approved Date
8/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> SCOPE OF PROFESSIONAL SERVICES TO PREPARE A <br /> STATE REVOLVING FUND (SRF) PROJECT PLAN FOR LOST BRIDGE <br /> NORTH (TA-3N) AND FLORIAN (TA_6) BASINS SEWER <br /> REHABILITATION <br /> SRF Loan Assistance Description of Work <br /> • Provide assistance and guidance to Decatur Public Works staff to submit a project plan report <br /> with the intent of obtaining an SRF Loan through the Infrastructure Financial Assistance <br /> Section(IFAS). The goal is for this sewer rehabilitation project(sewer mains, manholes and <br /> lower laterals)to be eligible for the Fiscal Year 2026 (starting July 1, 2025)Intended Use Plan <br /> (IUP)issued by IEPA—IFAS,typically in the month of June as a draft. <br /> • For the required project plan,revisit the Preliminary Opinion of Probable Project Costs <br /> (OPPC) from the 2017 SSAA and develop an updated OPPC. <br /> The Scope of Services for the Lost Bridge North and Florian Basins shall consist of the following tasks. <br /> 1. Funding Nomination Form (FNF). Prepare a project Funding Nomination Form meeting <br /> the requirements for obtaining an SRF Loan. Submit a Funding Nomination Form on or <br /> before March 31, 2025. Also included is preparing the Authorization of Representative to <br /> Sign Loan Documents form. <br /> 2. Project Plan Report.Prepare a project plan meeting the requirements for obtaining an SRF <br /> Loan. These requirements are found at 35 Ill. Adm. Code Section 662.320. The Project <br /> Planning Submittal Checklist shall be completed as part of Project Planning. Engineer will <br /> assist City with the completion of the forms required to be submitted in conjunction with the <br /> Project Plan,including the following. <br /> a. Project Planning Checklist <br /> b. Existing User Charge and O, M&R certification sheet <br /> C. Project Planning Verification of Cost and Effectiveness Analysis <br /> d. Preliminary Environmental Impacts Determination(PEID). <br /> e. Prepare updated opinions of probable project cost. <br /> 3. IEPA Loan Applicant Environmental Checklist. Obtain the required environmental <br /> signoffs (IDNR-SHPO, IDNR-Threatened & Endangered Species, US Army Corps of <br /> Engineers, IDNR-Office Water Resources, & IDOA) for the project and complete the IEPA <br /> Loan Applicant Environmental Checklist for City signature. Assist with preparing and <br /> obtaining the following: <br /> a. Project Environmental Impact Determination(PEID) Categorical Exclusion <br /> b. Advertisement of PEID for 10 day comment period <br /> Services to be performed by the City of Decatur <br /> 1. Public notifications. <br /> 2. Provide Engineer with data and information as needed for the completion of the Project Plan. <br /> Last Revised:2/03/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.