My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-281 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Cothren’s Custom Hardscapes, for the Lake Decatur Staley Basin Improvements - Hot Water Ditch, City Project 2023-16
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-281 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Cothren’s Custom Hardscapes, for the Lake Decatur Staley Basin Improvements - Hot Water Ditch, City Project 2023-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2024 12:22:26 PM
Creation date
8/27/2024 2:43:04 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-281
Res Ord Title
R2024-281 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Cothren’s Custom Hardscapes, for the Lake Decatur Staley Basin Improvements - Hot Water Ditch, City Project 2023-16
Department
Public Works
Approved Date
8/19/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Eligible bids received by the Purchasing Division will be delivered to the office of <br /> the City Engineer, or designee, and will be publicly opened and read. Any <br /> envelopes bearing a date and time stamp later than the deadline will be returned <br /> unopened. <br /> 5. All bidders who desire to be present at the bid opening may wait in the City Public <br /> Works (Engineering) office. <br /> At the time of the opening of bids, each Bidder will have completed a thorough site <br /> inspection and will have read and be thoroughly familiar with the plans and Contract Documents <br /> (including all addenda). The failure or omission of any Bidder to examine any form, instrument <br /> or document shall in no way relieve any Bidder from any obligation in respect to their bid. The <br /> Bidder is to confirm the completeness of the Bid Documents. If the Bidder determines their Bid <br /> Documents are incomplete or irregular it is the Bidders responsibility to bring this fact to the <br /> attention of the City Engineer. <br /> The submitted bid must be signed in the name of the Bidder and must bear the signature in <br /> long hand of the person or persons duly authorized to sign the bid. Changes in or additions to the <br /> bid forms, recapitulations of the work bid upon, alternative proposals or any other modifications <br /> of the bid which are not specifically called for in the Contract Documents may be subject to <br /> Owner's rejection of the bid as not being responsive to the advertisement. No oral telephone <br /> modification of any bid submitted will be considered and a telegraphic modification may be <br /> considered only if the post mark evidences that a copy of the modification by telegram, signed by <br /> the Bidder, was placed in the mail prior to the opening of the bid. <br /> The submitted bid must not contain erasures,corrections or changes from the printed forms <br /> as completed in typewriter or ink, unless such erasures, corrections or changes are authenticated <br /> by affixing in the margin immediately opposite the erasure,correction or change,the initials of the <br /> person who signed the bid or the initials of such other person as may be authorized by the Bidder <br /> to make erasures, corrections or changes in the bid, and said authorization must be evidenced by <br /> written confirmations, executed by the person authorized to sign the initial bid, attached to the bid <br /> at the time of submittal. <br /> Each bid must be submitted on the Bid Proposal provided and must be signed by the Bidder <br /> or their duly authorized agent. All blank spaces for bid prices must be filled in, in ink or <br /> typewritten, IN BOTH WORDS AND NUMBERS where called for in the Bid Proposal. If there <br /> is a discrepancy between the price in words and the price in numbers, the price in words will <br /> govern. If there is a discrepancy between the extended bid prices, the unit cost shall be the <br /> governing number and the total price or prices will be adjusted as necessary. <br /> The Owner reserves the right to pre-qualify all bids,post-qualify all bids, to reject all bids, <br /> not to make an award and/or accept the Proposal deemed most advantageous and to the best interest <br /> of the Owner. The Bidder must comply with all information and instructions for Bidders. The <br /> award of the Contract, if made by the Owner, will be made to the qualified Bidder submitting the <br /> lowest and best bid, but the Owner shall determine at their own discretion whether a Bidder is <br /> qualified to perform the Contract, whether by pre-qualifications, post-qualification or other <br /> methods,and what bid is the lowest and whether it is to the interest of the Owner to accept the bid. <br /> If awarded, a written Notice of Award will be sent to the successful Bidder(s). <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.