Laserfiche WebLink
Exhibit A <br /> ENGINEERING FEE ESTIMATE Date: 8/20/2024 <br /> Client: City of Decatur Estimator: CAL <br /> Project: Taylorville Road,Legion Dr,S.Fairview Ave,Granite Rd&Rock Dr.Watermain Replacement <br /> Scope: -8,450 ft of water main replacement,abandonment&relocation of services <br /> ITEM Senior Project Project Senior Design Other <br /> Engr. Manager Engineer Technician Engr Tech <br /> P-6 T-4 P-5 T-5 P-2 T-4 Expense Subtotal <br /> PROJECTADMIN $ 7,750" <br /> Project Kick-off Meeting 4 4 4 $ 100 $ 2,340 <br /> Monthly Project Status Reports 12 $ 1,980 <br /> Subconsultant Management 2 12 6 $ 3,430 <br /> SAIRYEY $ 38,620 <br /> Field survey(topo,level circuit,utility cuts)TWM 2 $ 19,950 $ 20,280 <br /> Create existing Pipe Networks 4 16 $ 3,300 <br /> Utility Locating TWM 4 $ 5,450 $ 6,110 <br /> Boundary Survey TWM 2 $ 8,600 $ 8,930 <br /> GEOTECH $ 11,120 <br /> Geotech Investigation SKS 2 4 $ 10,000 $ 11,120 <br /> CLIENT COORDINATION $ 10,190 <br /> Submit 50%Design Plans,Review Meeting w/City 4 8 2 $ 100 $ 2,670 <br /> Submit 90%Design Plans,Review Meeting w/City 4 8 2 $ 100 $ 2,670 <br /> Submit Final Design Plans,Review Meeting w/City 4 8 2 $ 100 $ 2,670 <br /> Meet with City Water Staff to discuss Staging/Standards 8 4 $ 200 $ 2,180 <br /> PRELIMINARY DESIGN(50%DESIGN) $ 43,440 <br /> Develop preliminary route plan 8 60 $ 11,220 <br /> Gather right-of-way information 8 $ 1,320 <br /> Coordination with utility companies 16 2 $ 3,690 <br /> Coordination with Railroad 16 $ 3,360 <br /> Coordination with IDOT 24 16 $ 7,680 <br /> Title Search TWM 4 $ 7,500 $ 8,160 <br /> Complete design computations 2 8 40 $ 8,010 <br /> FINAL DESIGN (100%DESIGN) ` $ 100,360 <br /> Title Sheet 4 $ 660 <br /> Location Maps,General Notes,Index 6 $ 990 <br /> Plan&Profile Sheets(8,450 ft=8 sheets) 4 4 2 16 140 $ 100 $ 27,450 <br /> Detail Sheets,including Erosion Control Details 4 16 $ 3,240 <br /> Quantity Calculations 4 4 4 4 4 $ 3,460 <br /> Traffic Control Details and Notes 8 16 2 8 24 $ 10,190 <br /> Develop Easement Documents(Assume 25 parcels)TWM $ 27,200 $ 27,200 <br /> Technical Specifications 4 4 4 60 8 $ 100 $ 12,840 <br /> Probable Construction Cost 4 8 $ 2,060 <br /> IEPA Permits 2 6 $ 100 $ 1,460 <br /> Quality Control Review 8 4 16 12 $ 7,960 <br /> Prepare bid documents based on comments 2 8 8 $ 2,850 <br /> BIDDING SERVICES $ 11,820 <br /> Prepare Advertisement notice and submit to City for publication 2 2 $ 630 <br /> Issue bidding documents to prospective bidders and maintain document holders lists 4 4 $ 1,260 <br /> Conduct pre-bid meeting&prepare meeting minutes 8 4 $ 100 $ 2,020 <br /> Prepare and issue addenda as needed 4 8 8 8 $ 4,760 <br /> Prepare tabulation of bids 2 4 $ 930 <br /> Review contractor bids and make recommendation regarding contract award 4 2 $ 960 <br /> Prepare contract documents for execution by contractor and City 4 4 $ 1,260 <br /> CONTINGENCY $ 20,000 <br /> Total Hours 38 160 108 28174 332 840 <br /> Billing Rate 230 165 210 175 150 165 <br /> Fee $ 8,740 $ 26,400 $ 22,680 $ 4,900 $ 26,100 $ 54,780 $ 79,700 $ 243,300 <br /> A-1 <br />