Laserfiche WebLink
Exhibit A <br /> 14. This Agreement includes no time for archaeological survey that may be required during Tribal <br /> consultation as no Tribal consultation is assumed necessary. <br /> 15. This Agreement does not include roadway typical section studies or pavement design studies. <br /> Existing and proposed typical section elements, including pavement cores and proposed <br /> pavement sections, will be provided by the City. <br /> 16. This Agreement does not include traffic data collection or traffic forecasting. <br /> 17. This Agreement does not include roadway lighting design. <br /> 18. This Agreement does not include utility potholing. <br /> 19. This Agreement does not include construction engineering services. Construction engineering <br /> services for will be provided by a subsequent Agreement. <br /> A-3 <br />