My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-320 Resolution Authorizing Acceptance of other Associated Costs to Install Fiber Conduit Under Lake Decatur at Lost Bridge Road
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-320 Resolution Authorizing Acceptance of other Associated Costs to Install Fiber Conduit Under Lake Decatur at Lost Bridge Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 4:10:15 PM
Creation date
10/10/2024 4:10:15 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-320
Res Ord Title
R2024-320 Resolution Authorizing Acceptance of other Associated Costs to Install Fiber Conduit Under Lake Decatur at Lost Bridge Road
Department
Public Works
Approved Date
10/7/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bodine Ele(tril <br /> QF DECATUR <br /> Traffic Division <br /> 1&15 North 22nd Street•Post Office Box 976-Decatur,IL 62526 <br /> Phone (217)423-2593•(BOG)252-3369•fax(217)42tM275 <br /> October 12024 <br /> Project: Crty of Decatur-Lost Bridge Fiber Raceway <br /> Location. Decatur.L <br /> Attention. AmEdwarrds <br /> Scope of Work <br /> We mill provide all necessary supenision.labor.materials and equipment for the successful completion of <br /> the above referenced gofer as herein sgecified <br /> Prrnide 7"SDR 7 pipe for mstallanon with 14 force main. <br /> Y Receive SDR 7.load on our reel trailer.dein-er to obsite. <br /> When bore is finished unroll remamins SDR 7.senure ends and remove reel trailer. <br /> > Our Price_S22,7€O.DO Dollars. <br /> Costs for paeanumz wages are not included in this proposal.Our standard working boars are 7:00A-M- <br /> 3:30PNf.Mond iv tbrouFh Friday excluding holidays. <br /> Use of this quotation Ls based upon the understanding that Bodine Elecmc 7raf5c Division of Decartrr has <br /> necessaih•assumed vermin condinotss in order to arrive at its best e---imate for doing the work. In the <br /> event that acetal conditions significandy vary from o rr assuuuipaons.then a fair edimtmem to the puce is <br /> expected"Riese include: <br /> Physical cotadiaans significanth•different:from what courd be detertatned from a <br /> reasonable nspection of the worksite and or information stipplied by customer. <br /> The correctness.and completeness of to can.-ac-docents is the sole responsubLdrY of <br /> those uho have prepared them.This proposal covers only that work ma:is adequatel? <br /> sho%m described and or detailed m the provided contrast do tanent°. <br /> Inability to start work and have reasonabLy umimerupted access to Bodme E.lectic of <br /> Decatur's work until completed <br /> Reasonably prompt resolution of nun•questions that may arise in the course of the work. <br /> including any necessary approvals by the customer or is agents. <br /> 5madard inmrmre coverage currently m effect at the time of submission.All non- <br /> standard unurance requirements shall be waived or the direct cost paid by the regUe3 or. <br /> Due to the volatility of the copper market,this proposal will be held firm for 15 dans. <br /> We farther reserve the right to negotiare the terms of the contract that the cnstoruer may wish to use. <br /> Bodine Electric"s pa}ment terms are 30 days from date of invoLce. <br />
The URL can be used to link to this page
Your browser does not support the video tag.