My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-344 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing and Heating Company, Inc. for the Vulcan Watermine Pipeline, City Project 2022-22
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-344 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing and Heating Company, Inc. for the Vulcan Watermine Pipeline, City Project 2022-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 5:20:27 PM
Creation date
11/7/2024 11:39:20 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-344
Res Ord Title
R2024-344 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing and Heating Company, Inc. for the Vulcan Watermine Pipeline, City Project 2022-22
Department
Public Works
Approved Date
11/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bus <br /> Boring, sampling, and laboratory procedures are discussed in detail on Sheets C-1 through C- <br /> 3, included in this report as Appendix C. All soil samples were examined and classified; cohesive <br /> soil samples were tested for moisture content and unconfined compressive strengths. <br /> Descriptions of these tests are given on Sheet C-2. Laboratory test results are given on the <br /> boring logs. Descriptive terminology and the classification system used in preparing the boring <br /> logs are shown on Sheet C-3. The Unified Soil Classification Chart is also included in Appendix <br /> C for further clarification. <br /> PROPOSED CONSTRUCTION <br /> It is our understanding the proposed construction at this site will consist of a new waterline <br /> ' pipeline. It is anticipated that some of the pipeline will be installed using trenchless methods <br /> and some will be installed in standard, open-cut trenches. Typically, the pipelines will be ten <br /> (10) to twenty (20) feet below ground surface. This type of construction, which involves open- <br /> cut excavations and excavations for the tie-in pits, must meet the requirements of the <br /> Occupational Safety and Health Administration's (OSHA) Construction Standards for <br /> Excavations. This standard contains specific excavation and trenching requirements based on <br /> soil types encountered by the excavation and/or trenches. The standard defines three (3) <br /> different types of soil commonly encountered in this area. Type "A" soil is defined as cohesive <br /> 1 soils (classified as CL or CH) with an unconfined compressive strength of at least 1.5 tons per <br /> square foot. <br /> ' Type "B" soil is defined as cohesive soils (classified as CL or CH) with an unconfined <br /> compressive strength of at least 0.5 tons per square foot, but less than 1.5 tons per square foot, <br /> and stable (does not contain flowing water) cohesionless soils (classified as GC, SC, GM, SM, <br /> GW, SW, ML). <br /> Type "C" soil is defined as any soil that contains seeping water; cohesive soils with an unconfined <br /> compressive strength less than 0.5 tons per square foot, and any other unstable soils. Typical <br /> excavation diagrams have been prepared for each of these soil types and for different <br /> combinations. See Appendix D for these diagrams. <br /> Geotechnical Exploration for Sanitary Pipeline <br /> New Vulcan Waterline Pipeline, Decatur, Macon County, Illinois <br /> SKS Project No. 12-418885 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.