My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-344 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing and Heating Company, Inc. for the Vulcan Watermine Pipeline, City Project 2022-22
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-344 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing and Heating Company, Inc. for the Vulcan Watermine Pipeline, City Project 2022-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 5:20:27 PM
Creation date
11/7/2024 11:39:20 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-344
Res Ord Title
R2024-344 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing and Heating Company, Inc. for the Vulcan Watermine Pipeline, City Project 2022-22
Department
Public Works
Approved Date
11/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIPE FLOATING CONSIDERATIONS <br /> Pipe floating, as a result of high groundwater, is a consideration in areas of shallow fills. The <br /> design engineer should make every attempt to ensure an adequate amount of fill is placed above <br /> ' the pipe to prevent such floating. A rule of thumb to ensure an adequate amount of soil is above <br /> the pipe, is to place a volume of soil equal to one and one-half(1.5) times the volume of the pipe <br /> ' above the pipe itself. <br /> LATERAL EARTH PRESSURES <br /> Lateral earth pressures will be imposed on those jack pit walls and other such structural walls <br /> retaining fill materials or supporting structural backfill below grade. The net lateral pressure <br /> developing against these walls will depend upon the type of movement the wall can undergo, <br /> the backfill soil used, the wall height, and surcharge loading. <br /> ' - structural walls such as rigid cylindrical walls valve <br /> The lateral earth pressure on non yielding struc g y <br /> ' vaults), is the earth pressure at rest condition. This type of earth pressure may be estimated by <br /> assuming the wall pressure is equal to the pressure imposed by a fluid with a unit weight of 60.0 <br /> ' lbs. per cu. ft. This pressure is based on a coefficient of lateral earth pressure (at rest) equal to <br /> 0.5 for sand or gravel backfill. <br /> ' If low plasticity silty clays are used for backfill, this coefficient should be increased to 0.75 and <br /> the unit weight of the assumed fluid should be increased to 90.0 lbs. per cu. ft. In addition to the <br /> earth pressure, the expected water pressure should be added to compute the total lateral <br /> pressure. <br /> The lateral earth pressure for yielding structural walls, such as temporary sheet pile walls and <br /> walls restrained only at the bottom, is the active earth pressure condition. This type of earth <br /> pressure may be estimated by assuming wall pressure equal to the pressure imposed by a fluid <br /> with a unit weight of 40.0 lbs. per cu. ft. This pressure is based on a coefficient of active earth <br /> pressure equal to 0.33 for sand or gravel backfill. If the temporary sheet pile walls must stand <br /> for more than a few months, the fluid pressure should be increased to 60.0 lbs. per cu. ft. <br /> because the clayey soils will tend to creep, thus increasing the wall pressure. <br /> Geotechnical Exploration for Sanitary Pipeline <br /> New Vulcan Waterline Pipeline, Decatur, Macon County, Illinois <br /> SKS Project No. 12-418885 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.