My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-344 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing and Heating Company, Inc. for the Vulcan Watermine Pipeline, City Project 2022-22
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-344 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing and Heating Company, Inc. for the Vulcan Watermine Pipeline, City Project 2022-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 5:20:27 PM
Creation date
11/7/2024 11:39:20 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-344
Res Ord Title
R2024-344 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing and Heating Company, Inc. for the Vulcan Watermine Pipeline, City Project 2022-22
Department
Public Works
Approved Date
11/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bus <br /> The lateral pressure caused by a surcharge load, such as a traffic load, should be incorporated <br /> in the wall design. This lateral pressure may be computed by multiplying the coefficient of earth <br /> ' pressure by the surcharge pressure. <br /> The normal groundwater levels at this site are anticipated to be above the bottom of the proposed <br /> walls. Therefore, water pressure needs to be included in the wall designs. However, if possible <br /> and economically feasible, it is recommended that all the walls at this site be designed and <br /> constructed with an effective sub-drainage system in order to remove any transient water that <br /> ' may enter the soil. Additionally, it is recommended that the permanent walls be backfilled with <br /> well graded sand or gravel, in order to minimize any lateral pressures that may be exerted on <br /> ' the walls, and to help provide drainage. <br /> CORROSION CONSIDERATIONS <br /> Based on our past experience with soil conditions in this area, it is our judgment that the cohesive <br /> natural soils are slightly to moderately corrosive to buried steel. Therefore, all buried utilities of <br /> different metallic construction should be carefully isolated from each other using dielectric <br /> ' connections, or similar methods to minimize corrosion problems. All mechanical connections <br /> should be carefully coated with coal tar epoxy paint, or a similar coating suitable for underground <br /> ' applications. Further, any metal extending into the ground may also require cathodic protection. <br /> The corrosive nature of the soils does not, in our judgment, extend to concrete corrosion. <br /> Therefore, we recommend the use of conventional Type 1 Portland Cement. However, all steel <br /> in concrete structures extending below grade, should receive a maximum amount of concrete <br /> cover to avoid contact with corrosive soils. Further, project specifications should detail <br /> densification practices for the concrete to assure that it is a dense mass with a low permeability. <br /> Geotechnical Exploration for Sanitary Pipeline <br /> New Vulcan Waterline Pipeline, Decatur, Macon County, Illinois <br /> SKS Project No. 12-418885 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.