My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-344 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing and Heating Company, Inc. for the Vulcan Watermine Pipeline, City Project 2022-22
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-344 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing and Heating Company, Inc. for the Vulcan Watermine Pipeline, City Project 2022-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 5:20:27 PM
Creation date
11/7/2024 11:39:20 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-344
Res Ord Title
R2024-344 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing and Heating Company, Inc. for the Vulcan Watermine Pipeline, City Project 2022-22
Department
Public Works
Approved Date
11/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> SSS <br /> 1 <br /> The best compaction of these cohesive soils may be obtained with sheepsfoot rollers operating <br /> on thin (6-inch maximum) horizontal lifts/layers, after the soils' natural moisture content has been <br /> adjusted as recommended. It is recommended the earthen berms be compacted to a minimum <br /> 1 of 95% of the maximum Standard Proctor dry density as determined by the ASTM D-698 <br /> laboratory compaction test for each soil type used. <br /> 1 Many of the surface cohesive soils are relatively slow draining. Accordingly, water can perch in <br /> the fill material on these particular soils, which may potentially affect excavation procedures. <br /> ' Many of the on-site soils are also sensitive to disturbance by construction traffic, particularly in <br /> the presence of groundwater. Because of this, portions of the excavations may need to be <br /> ' performed with backhoe-type equipment. Pumps for water removal should be provided. The <br /> contractor should employ such construction equipment and cut/fill methods appropriate for the <br /> site conditions present during construction. <br /> For convenience, we have outlined the compaction requirements below: <br /> ' Area Percent of <br /> Standard Proctor <br /> General Trench Backfill 90 <br /> Grading for Landscape/Drainage 90 <br /> 0' to 3' Below Paved Areas 100 <br /> 3' and Greater Below Paved Areas 95 <br /> 1 <br /> Geotechnical Exploration for Sanitary Pipeline <br /> New Vulcan Waterline Pipeline, Decatur, Macon County, Illinois <br /> SKS Project No. 12-418885 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.