My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-171 Resolution Authorizing a Construction Engineering Contract with Crawford, Murphy and Tilly for South Water Treatment Plant Electrical Improvements, City Project 2022-18
COD
>
City Clerk
>
RESOLUTIONS
>
2025
>
R2025-171 Resolution Authorizing a Construction Engineering Contract with Crawford, Murphy and Tilly for South Water Treatment Plant Electrical Improvements, City Project 2022-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:42:06 PM
Creation date
5/2/2025 1:04:33 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2025-171-
Res Ord Title
R2025-171 Resolution Authorizing a Construction Engineering Contract with Crawford, Murphy and Tilly for South Water Treatment Plant Electrical Improvements, City Project 2022-18
Department
City Manager
Approved Date
4/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
652
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 111 ADVERTISEMENT FOR BIDS <br /> TIME AND PLACE OF OPENING BIDS: <br /> Sealed proposals for the improvement described herein will be received at the City <br /> 111 Purchasing Division located on the first floor of the Civic Center, #1 Gary K. Anderson Plaza, <br /> Decatur, Illinois, 62523, until MARCH 26, 2025 AT 10:00 A.M. and thereafter publicly <br /> opened and read. <br /> DESCRIPTION OF PROJECT: <br /> The proposed improvement is officially known as: <br /> 111 SOUTH WTP ELECTRICAL IMPROVMENTS <br /> IEPA LOAN NO. L17-2292 <br /> CITY PROJECT 2022-18 <br /> The proposed project herein specified and described includes the following work: <br /> THE ELECTRICAL IMPROVEMENTS TO THE SOUTH WATER <br /> TREATMENT PLANT,NITRATE FACILITY AND THE RAW WATER PUMP <br /> STA TION AND OTHER MISCELLANEOUS IMPROVEMENTS. <br /> A. AT THE SOUTH WATER TREATMENT PLANT REPLACE THE EXTERIOR MEDIUM <br /> VOLTAGE SERVICE ENTRANCE RATED ELECTRICAL GEAR FEEDING THE <br /> FACILITY, REPLACE THE MEDIUM VOLTAGE MAIN DISTRIBUTION <br /> SWITCHGEAR, MEDIUM VOLTAGE HIGH SERVICE PUMP MOTOR CONTROL <br /> CENTER, 480VAC HVAC AND CHEMICAL FEED MOTOR CONTROL CENTERS, <br /> AND REPLACE SCADA CONTROL PANELS ASSOCIATED WITH SUCH <br /> IMPROVEMENTS(SCC-2). IN ADDITION,REPLACE ALL THE LIGHTING IN THE <br /> �! WATER TREATMENT FACILITY, INCLUDING AN ASSOCIATED LIGHTING <br /> CONTROL SYSTEM. <br /> B. AT THE NITRATE FACILITY REPLACE THE EXISTING EXTERIOR <br /> TRANSFORMERS, MOTOR CONTROL CENTER, FEED PUMP VARIABLE <br /> FREQUENCY DRIVES,AND THE SCADA CONTROL PANEL(SCC-5). IN ADDITION, <br /> REPLACE THE HVAC UNIT HEATERS TO THE FACILITY. <br /> C. AT THE RAW WATER PUMP STATION, REPLACE THE MEDIUM VOLTAGE <br /> MOTOR CONTROL CENTER WITH MEDIUM VOLTAGE VARIABLE FREQUENCY <br /> DRIVES,REPLACE EXTERIOR LOW VOLTAGE TRANSFORMERS,REPLACE THE <br /> 480VAC MOTOR CONTROL CENTER, AND UPGRADE THE SCADA CONTROL <br /> PANELS (SCC-10, SCC-11). <br /> I <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.