My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-171 Resolution Authorizing a Construction Engineering Contract with Crawford, Murphy and Tilly for South Water Treatment Plant Electrical Improvements, City Project 2022-18
COD
>
City Clerk
>
RESOLUTIONS
>
2025
>
R2025-171 Resolution Authorizing a Construction Engineering Contract with Crawford, Murphy and Tilly for South Water Treatment Plant Electrical Improvements, City Project 2022-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:42:06 PM
Creation date
5/2/2025 1:04:33 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2025-171-
Res Ord Title
R2025-171 Resolution Authorizing a Construction Engineering Contract with Crawford, Murphy and Tilly for South Water Treatment Plant Electrical Improvements, City Project 2022-18
Department
City Manager
Approved Date
4/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
652
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.03 REVISE the Project Manual on page 18 the last paragraph to read as <br /> follows: <br /> ' "The Bidder grants the Owner the right to hold the lowest three (3) <br /> Proposals received, together with the accompanying bid securities, for <br /> a period of 90 days after the date opening of said Proposals." <br /> AD-1-5 SPECIFICATION 01 78 00— Closeout Procedures <br /> 5.01 ADD Section 3.02 as follows: <br /> "3.02 SITE RESTORATION <br /> A. Following the completion of all earth disturbing activities. All <br /> disturbed areas shall be restored to their original grades and shall be <br /> seeded. Contractor is responsible for turf establishment and may need <br /> ' to reseed areas to ensure adequate germination to the satisfaction of <br /> the Owner or the Owner's Representative." <br /> ' AD-1-6 SPECIFICATION 26 09 17—Programmable Logic Control Panels <br /> REPLACE paragraph 2.02 F with the following <br /> "F. Managed Ethernet Switch <br /> 1. Minimum 8-port copper 10/100 Mbit/s RJ45, 2-port <br /> ' SFP+, industrial grade, DIN-rail mount, 24VDC supply <br /> voltage, VLAN, RSTP, provided with SFP modules compatible <br /> with plant network. <br /> a. Cisco IE-3300-8T2X-E, or engineer approved equal <br /> ' 2. SFP module for 10Gb uplink singlemode fiber(9/125 <br /> µm), LC connection,10km distance <br /> ta. Cisco SFP-10G-LR-S, or engineer approved equal." <br /> AD-1-7 SPECIFICATION 26 13 16—Metal-Enclosed Switchgear Load <br /> Interrupter <br /> Under 2.01 MANUFACTURERS ADD the following: <br /> "E. Avail Switchgear Systems" <br /> AD-1-8 SPECIFICATION 26 13 26—Medium Voltage Metal-Clad Switchgear <br /> ' Under 2.01 MANUFACTURERS ADD the following to item "B": <br /> "Avail Switchgear Systems" <br /> AD-1-9 SPECIFICATION 26 18 39—Medium Voltage Motor Controllers <br /> Under 1.02 RELATED SECTIONS DELETE sentences A. B. and C. <br /> AD-1-10 SPECIFICATION 26 24 13—Switchboards <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.