Laserfiche WebLink
Exhibit A <br /> SCOPE OF WORK <br /> ITEM Senior Project Project Senior Design Other <br /> Engr. Manager Engineer Technician Engr Tech <br /> P-7 T-4 P-5 T-5 P-2 T-4 Expense Subtotal <br /> ®MIN $ 2,7201 <br /> Monthly Project Status Reports 12 $ 2,040 <br /> Subconsultant Management 4 $ 680 <br /> rS 2,040 <br /> Submit 50%Design Plans,Review Meeting w/City 4 $ 680 <br /> Submit 90%Design Plans,Review Meeting w/City 4 $ 680 <br /> Submit Final Design Plans,Review Meeting w/City 4 $ 680 <br /> IIIIIIIIIIIIIIINIMIIIIIIIIIIIIIIIIIIIIMIIIINIMW <br /> FS 31,630 <br /> Field survey&Easement Docs(Assume 3-5 parcels)TWM 2 $ 23,500 $ 23,840 <br /> Create existing Pipe Networks 8 $ 1,360 <br /> Utility Locating TWM 2 $ 2,750 $ 3,090 <br /> RR&Add'l Easement Doc(Bob Brady)TWM 2 $ 3,000 $ 3,340 <br /> Geotech FS 10,340 <br /> Geotech Investigation SKS 2 $ 10,000 $ 10,340 <br /> PRELIMIN yDESIGN(50%DESIGN) '$ 32,755: <br /> Develop preliminary route plan 2 1 40 $ 7,355 <br /> Gather nght-of-way information 4 $ 680 <br /> Coordination with utility companies 2 2 $ 680 <br /> Coordination with Railroad 8 $ 1,360 <br /> Coordination with Township 8 $ 1,360 <br /> Coordination with IDOT 12 4 $ 3,260 <br /> TEPA NOI/SHPO/Joint Permit and Tribal Coordination 2 16 32 $ 7,500 $ 16,240 <br /> Complete design computations 2 4 4 $ 1,820. <br /> FINAL DESIGN(100%DESIGN) ASV <br /> $ 54AO 0_ <br /> Title Sheet <br /> 2 $ 340 <br /> Location Maps,General Notes,Index 2 $ 340 <br /> Plan&Profile Sheets(6,200 ft=7 sheets) 4 80 $ 150 $ 14,610 <br /> Detail Sheets,including Erosion Control Details 2 4 $ 1,110 <br /> Quantity Calculations <br /> 4 2 8 $ 2,590 <br /> Traffic Control Details and Notes 2 2 4 $ 1,480 <br /> Technical Specifications 4 4 4 40 4 $ 150 $ 9,550 <br /> Probable Construction Cost 4 4 $ 1,420 <br /> Railroad Permits 2 8 8 $ 100 $ 3,670 <br /> TEPA Permits 2 2 4 4 $ 100 $ 2,410 <br /> Quality Control Review 4 4 8 4 <br /> $ 4,120 <br /> DCEO Grant Updates 8 40 $ 9,960 <br /> Prepare bid documents based on comments 2 8 8 $ 2,940 <br /> BIDDING SEI -111111.111.1111111111111111111111111.111111111W <br /> Prepare Advertisement notice and submit to City for publication 2 $ 340 <br /> Issue bidding documents to prospective bidders and maintain document holders 2 $ 340 <br /> Conduct pre-bid meeting&prepare meeting minutes 4 $ 680 <br /> Prepare and issue addenda as needed 4 6 4 $ 2,860 <br /> Prepare tabulation of bids 2 $ 340 <br /> Review contractor bids and make recommendation regarding contract award 1 2 $ 585 <br /> • <br /> Prepare contract documents for execution by contractor and City 1 2 $ 585 <br /> Total Hours 18 116 113 12 88 166 513 <br /> Billing Rate 245 170 215 185 155 170 <br /> Fee $ 4,410 $ 19,720 $ 24,295 $ 2,220 $ 13,640 $ 28,220 $ 47,250 $ 139,800 <br /> A-1 <br /> Last Revised:2/03/2022 <br />