Exhibit A
<br /> SCOPE OF WORK
<br /> ITEM Senior Project Project Senior Design Other
<br /> Engr. Manager Engineer Technician Engr Tech
<br /> P-7 T-4 P-5 T-5 P-2 T-4 Expense Subtotal
<br /> ®MIN $ 2,7201
<br /> Monthly Project Status Reports 12 $ 2,040
<br /> Subconsultant Management 4 $ 680
<br /> rS 2,040
<br /> Submit 50%Design Plans,Review Meeting w/City 4 $ 680
<br /> Submit 90%Design Plans,Review Meeting w/City 4 $ 680
<br /> Submit Final Design Plans,Review Meeting w/City 4 $ 680
<br /> IIIIIIIIIIIIIIINIMIIIIIIIIIIIIIIIIIIIIMIIIINIMW
<br /> FS 31,630
<br /> Field survey&Easement Docs(Assume 3-5 parcels)TWM 2 $ 23,500 $ 23,840
<br /> Create existing Pipe Networks 8 $ 1,360
<br /> Utility Locating TWM 2 $ 2,750 $ 3,090
<br /> RR&Add'l Easement Doc(Bob Brady)TWM 2 $ 3,000 $ 3,340
<br /> Geotech FS 10,340
<br /> Geotech Investigation SKS 2 $ 10,000 $ 10,340
<br /> PRELIMIN yDESIGN(50%DESIGN) '$ 32,755:
<br /> Develop preliminary route plan 2 1 40 $ 7,355
<br /> Gather nght-of-way information 4 $ 680
<br /> Coordination with utility companies 2 2 $ 680
<br /> Coordination with Railroad 8 $ 1,360
<br /> Coordination with Township 8 $ 1,360
<br /> Coordination with IDOT 12 4 $ 3,260
<br /> TEPA NOI/SHPO/Joint Permit and Tribal Coordination 2 16 32 $ 7,500 $ 16,240
<br /> Complete design computations 2 4 4 $ 1,820.
<br /> FINAL DESIGN(100%DESIGN) ASV
<br /> $ 54AO 0_
<br /> Title Sheet
<br /> 2 $ 340
<br /> Location Maps,General Notes,Index 2 $ 340
<br /> Plan&Profile Sheets(6,200 ft=7 sheets) 4 80 $ 150 $ 14,610
<br /> Detail Sheets,including Erosion Control Details 2 4 $ 1,110
<br /> Quantity Calculations
<br /> 4 2 8 $ 2,590
<br /> Traffic Control Details and Notes 2 2 4 $ 1,480
<br /> Technical Specifications 4 4 4 40 4 $ 150 $ 9,550
<br /> Probable Construction Cost 4 4 $ 1,420
<br /> Railroad Permits 2 8 8 $ 100 $ 3,670
<br /> TEPA Permits 2 2 4 4 $ 100 $ 2,410
<br /> Quality Control Review 4 4 8 4
<br /> $ 4,120
<br /> DCEO Grant Updates 8 40 $ 9,960
<br /> Prepare bid documents based on comments 2 8 8 $ 2,940
<br /> BIDDING SEI -111111.111.1111111111111111111111111.111111111W
<br /> Prepare Advertisement notice and submit to City for publication 2 $ 340
<br /> Issue bidding documents to prospective bidders and maintain document holders 2 $ 340
<br /> Conduct pre-bid meeting&prepare meeting minutes 4 $ 680
<br /> Prepare and issue addenda as needed 4 6 4 $ 2,860
<br /> Prepare tabulation of bids 2 $ 340
<br /> Review contractor bids and make recommendation regarding contract award 1 2 $ 585
<br /> •
<br /> Prepare contract documents for execution by contractor and City 1 2 $ 585
<br /> Total Hours 18 116 113 12 88 166 513
<br /> Billing Rate 245 170 215 185 155 170
<br /> Fee $ 4,410 $ 19,720 $ 24,295 $ 2,220 $ 13,640 $ 28,220 $ 47,250 $ 139,800
<br /> A-1
<br /> Last Revised:2/03/2022