Laserfiche WebLink
SECTION B-CLARIFICATIONS/EXCEPTIONS <br /> 1. The electrical permit has had the permit fee waved for this project. <br /> 2. We have deducted the Ameren incentive amount of$47,101.00 from our proposal. This was <br /> an estimated <br /> amount"up to"the amount listed. <br /> 3. All programming is included in this price. The Charge Point technian will assist in the <br /> initial set up of the chargers. <br /> 4. We will coordinate all utility power connections with Ameren. <br /> 5. We recommend the City of Decatur install a lock on the electrical panel to <br /> prevent the public from accessing the electrical panel. <br /> 6. Tax has been with heald from this project,we will need the tax exemption certificate. <br /> SECTION C-EXCLUSIONS <br /> 9. All waste generated by Bodine Electric will be disposed of in dumpsters provided by the site <br /> owner or general contractor. Unless explicitly called out for in the scope of work, Bodine has <br /> excluded all work and cost associated with removal, disposal or abatement of any <br /> contaminated spoils or material. <br /> 10. This proposal does not include any utility costs. <br /> 11. All costs associated with permit(s)are excluded from this proposal. <br /> 12. Bodine Electric of Decatur will require a tax-exempt certificate for any project that is <br /> awarded as such before executing a contract. <br /> 13. Costs associated with site layout/surveying are excluded from this proposal. <br /> 14. This proposal does not include any work related to temperature controls, including any <br /> conduit,wire or devices related to such controls. <br /> 15. Corrections to pre-existing code violations are not included in this proposal. <br /> 16. Patching, painting and firestopping are excluded from this proposal. <br /> SECTION D-OTHER CONDITIONS <br /> Costs for premium wages are not included in this proposal.Our standard working hours are 7 a.m.to <br /> 3:30 p.m., Monday through Friday excluding holidays. <br /> This quotation is based upon the understanding that Electrical Service Company has necessarily assumed <br /> certain conditions to arrive at its best estimate for performing the work. In the event actual conditions <br /> significantly vary from our assumptions,then a fair adjustment to the price is expected.These include: <br /> 7. Physical conditions significantly different from what could be determined from a reasonable <br /> inspection of the worksite and/or information supplied by customer. <br /> 8. The correctness and completeness of the contract documents are the sole responsibility of those who <br /> have prepared them.This proposal covers only that work that is adequately shown,described and/or <br /> detailed in the provided contract documents. <br /> 9. Inability to start work and have reasonably uninterrupted access to Electrical Service Company's <br /> work until completed. <br /> 10. Reasonably prompt resolution of any questions that may arise in the course of the work, <br /> including any necessary approvals by the customer or its agents. <br /> 11. Standard insurance coverage currently in effect at the time of submission.All non-standard <br /> insurance requirements shall be waived, or the direct cost paid by the requestor. <br /> 12. Due to the volatility of the commodities market,this proposal will be held firm until the date specified <br /> on Page 1 of this document. <br /> NOTICE:THIS PROPOSAL IS CONTINGENT ON A LACK OF IMPACT BY ANY PANDEMIC OR NATIONAL <br /> EMERGENCY.Given <br />