Laserfiche WebLink
pavement has completely failed in some locations and will be reconstructed. In total, of the City's 825 total <br /> lane miles, 6.1 lane miles will be rehabilitated as part of this project. <br /> The proposed street list for asphalt rehabilitation is as follows: <br /> Designed <br /> Street From To Length Length Average Functional Treatment <br /> (FT) (Lane Daily Classification <br /> Miles) Traffic <br /> (ADT) <br /> Mill & Overlay. <br /> S. Franklin Grove Rd Enlow Dr 3.998 3.03 5.000 Minor Arterial Patch & Ramps <br /> St <br /> Mill & Overlay <br /> W. Imboden Medial Dr Franklin St 2.250 0.85 850 Minor <br /> Dr Collector <br /> Mill & Overlay. <br /> W. Ash Ave MacArthur IL RT 51 2.508 0.95 5.300 Minor Arterial Patch & Ramps <br /> Dr <br /> Overlay & Patch <br /> E. Ash Ave IL RT 51 MLK Jr Dr 1.205 0.91 5.650 Minor Arterial <br /> Reconstruction <br /> E. Van IL RT 51 MLK Jr Dr 907 0.34 375 Local Road <br /> Buren Ave <br /> Total 10,868 6.09 <br /> In addition to the paving on these streets, sidewalk curb ramps will be reconstructed to conform with ADA <br /> requirements. New pavement striping and utilities will be adjusted. <br /> Letting Results <br /> The project scope and specifications were prepared by the Engineering Division and approved by the Illinois <br /> Department of Transportation (IDOT) for the use of Motor Fuel Tax funds. The project was advertised on <br /> October 1. 2025. and October 8. 2025, and bids were opened on October 22, 2025. The results of the letting are <br /> as follows (bid tabulation attached): <br /> Bidder Bid Price Compared to Engineer's Est. <br /> Over (Under) <br /> Dunn Company <br /> S2,673,124.77 12.73% <br />