My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 4:06:19 PM
Creation date
3/5/2026 4:06:12 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-49
Res Ord Title
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
Department
Public Works
Approved Date
3/2/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br /> CITY OF DECATUR - PUBLIC WORKS DEPARTMENT <br /> SANITARY SEWER SYSTEM REHABILITATION FOR <br /> LOST BRIDGE NORTH (TA_3N) & FLORIAN (TA_6) BASINS <br /> SCOPE OF DESIGN PHASE SERVICES <br /> ordinance, which authorizes the debt from the loan to be incurred. <br /> Ordinance <br /> to be finalized by City attorney or staff. <br /> h. City will provide staff (attorney) to offer a legal opinion verifying the <br /> legality, <br /> enforceability and acceptability of the ordinance including coverage <br /> requirements (if any). <br /> 4. Complete Certification of Engineering or Professional Services Contract. <br /> 5. Complete the Executive Compensation Data form. <br /> 6. Complete the Public Notification / Signage certificate. <br /> 7. Tax certification form for loan eligibility. <br /> 8. Prepare useful life calculation worksheet. <br /> 9. Water Pollution Control Loan Program federal reporting requirements form. <br /> Task 7 — Bidding <br /> 1. Finalize all bidding documents. <br /> 2. Advertise the project for bids — one round of bidding. <br /> 3. Address bidder inquiries during the bid period. <br /> 4. Schedule, coordinate and conduct one pre-bid meeting with potential bidders. <br /> 5. Prepare pre-bid meeting minutes and distribute to attendees. <br /> 6. Issue addendums as necessary. <br /> 7. Evaluate bids for compliance with COD and IFAS requirements and prepare a <br /> recommendation and Notice of Intent to Award. <br /> 8. Submit award documents to IFAS: <br /> a. Bidding review certification checklist and attachments — 25 items. <br /> b. Other IEPA certifications, as required. <br /> Task 8 — Project Management <br /> 1. Provide project guidance and coordination via the Project Manager from start of <br /> design through the notice of intent to award of the construction contract. <br /> 2. Prepare an internal Quality Assurance Plan (QAP) <br /> 3. Prepare, update and maintain a detailed project schedule <br /> 4. Provide direction and coordination to team members <br /> 5. Provide monthly progress updates to COD <br /> 6. Monitor project costs <br /> 7. Perform quality assurance reviews <br /> Task 9 — Unforeseen Work <br /> 24006892.01 A-1-7 02/19/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.