My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 4:06:19 PM
Creation date
3/5/2026 4:06:12 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-49
Res Ord Title
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
Department
Public Works
Approved Date
3/2/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br /> CITY OF DECATUR - PUBLIC WORKS DEPARTMENT <br /> SANITARY SEWER SYSTEM REHABILITATION FOR <br /> LOST BRIDGE NORTH (TA_3N) & FLORIAN (TA_6) BASINS <br /> SCOPE OF DESIGN PHASE SERVICES <br /> Task 5 — Perform Internal Quality Assurance Reviews of all Deliverables <br /> 1. Perform quality assurance review on the bidding documents <br /> 2. Perform quality assurance review on the contracting documents <br /> 3. Perform quality assurance review on the technical specification documents <br /> 4. Perform quality assurance review on the plan sheets <br /> 5. Submit plans, project manual and checklist to IFAS for compliance review <br /> Task 6 — SRF Loan Application <br /> 1. Prepare updated FNFs for 2026 and 2027. <br /> 2. Prepare an SRF Loan Application that generally includes the following: <br /> a. Certification Regarding Debarment, suspension and Other Responsibility <br /> Matters. <br /> b. Intent Regarding National Flood Insurance. <br /> c. Certification Regarding Project Site, Rights-of-Way, Easements and <br /> Permits. <br /> d. Resolution Authorizing a Representative to Sign Loan Documents. <br /> e. Loan Applicant Acknowledgement of the Use of American Iron and Steel <br /> Products Requirement/ BABA. <br /> f. Taxpayer Identification Number Form. <br /> g. Unique Entity ID number (replaced DUNS number). <br /> 3. Complete the Financial Information Checklist that generally includes the <br /> following: <br /> a. Certified ordinance authorizing debt <br /> b. Legal opinion concerning enforceability of obligations and absence of <br /> conflicts <br /> c. Detailed analysis of dedicated source of revenue, including a 5-year <br /> projected budget <br /> d. Copies of Sewer Use ordinance <br /> e. Copy of latest fiscal year financial and compliance audit <br /> f. City will provide the adequate documentation to meet the requirements of <br /> Demonstration of a Dedicated Source of Revenue required for the loan. <br /> g. Consulting Engineer will assist City with the development of a draft model <br /> 24006892.01 A-1-6 02/19/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.