My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 4:06:19 PM
Creation date
3/5/2026 4:06:12 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-49
Res Ord Title
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
Department
Public Works
Approved Date
3/2/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br /> CITY OF DECATUR - PUBLIC WORKS DEPARTMENT <br /> SANITARY SEWER SYSTEM REHABILITATION FOR <br /> LOST BRIDGE NORTH (TA_3N) & FLORIAN (TA_6) BASINS <br /> SCOPE OF DESIGN PHASE SERVICES <br /> 3. Prepare repair and rehabilitation plan sheets to support the bidding documents. <br /> Profile sheets not included. <br /> 4. Prepare technical specifications. <br /> 5. Calculate plan quantities and prepare opinions of probable construction cost to <br /> compare to the project budgets. <br /> Task 3: Sewer Lower Lateral Rehabilitation (from the sewer main) <br /> 1. Procure and coordinate full length sewer lateral inspection services from <br /> preferred CCTV contractor(s) to inspect approximately 1,010 sewer laterals in <br /> Lost Bridge North and Florian basins. COD agrees to clean the sewer mains prior <br /> to lateral inspections. Includes CMT oversight in the field for 2 days/week for 6 <br /> months. <br /> 2. Review prior CCTV inspection and manhole inspection reports and identify <br /> protruding laterals and buried manholes that would hinder lateral inspections. <br /> Develop a list of protruding laterals and buried manholes and forward to COD for <br /> mitigation. <br /> 3. Review specific sewer lower lateral repair and rehabilitation options and vendors <br /> with City staff to determine desired approaches. <br /> 4. Review sewer lateral inspection video and reports (as received monthly) to <br /> determine the laterals requiring repair and/or rehabilitation. <br /> 5. Sewer lateral inspections will be performed to reveal the condition of the sewer <br /> laterals, which prior to these inspections has been unknown. An assessment of <br /> the condition for all sewer laterals inspected will be performed to determine an <br /> appropriate length of rehabilitation needed for each lateral. The cost of <br /> rehabilitating the laterals will be considered in this assessment. The length of <br /> lateral rehabilitation required for LBN and Florian basins may be different. <br /> 6. Prepare repair and rehabilitation plan sheets to support the bidding documents. <br /> 7. Prepare technical specifications. Specifications will direct the winning bid <br /> Contractor their responsibility includes obtaining right-of-entry prior to <br /> rehabilitating the sewer lateral. <br /> 8. Calculate plan quantities and prepare an opinion of probable construction cost to <br /> compare to the project budget. <br /> 9. Coordinate and manage weekly progress meetings with CCTV contractor <br /> performing sewer lateral inspections. <br /> Task 4 — Prepare Bidding and Contracting Documents <br /> 1. Prepare bidding documents that conform to COD and SRF requirements. <br /> 2. Prepare contracting documents that conform to COD and SRF requirements. <br /> 24006892.01 A-1-5 02/19/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.